Laserfiche WebLink
� _._ ..���n.ea, tVTRACORP �uoua <br /> '. �. .iiU 16:40 F:1Y 20672845fi1 INTRAf.ORP f�j002 <br /> � l �.� <br /> � n <br /> I N T R A C O R P <br /> 2/I S/97 <br /> Ciry o£Everott <br /> Public Works Division <br /> 3200 Cedar Street <br /> Everctt, Weshington 98201 <br /> Attn: Mr.Gordon Witcher <br /> RE: Port Chatham Seafood's. <br /> Dear Mr. Witeher, <br /> We have completed the design and anelysis of the water usage for the port Chathum Facility to be located <br /> at our Seaway Fecility.The£ollowing is an outline of the current water usage and averages that have been <br /> used in calculnting the Woter"System Development Fee". <br /> Suile 300 1'ort Chathum wilf be combining two existing processing fecilities into the new Seaway Everett location. <br /> Port Chathum has rcviewed the'u water usage, besed on actual water billings, for both existing locations <br /> 25os se:and nvenue for the 1996 calendaz year of operation, see attached usage brcakdown. <br /> Swhb,Wasnin0�an <br /> 9s�xi��a�3 For the purpose of determining the water usage thet will be required,we have taken the 3 peak months of <br /> Tel:(20b)625•9226 operation and used an average of these three months as e basis for maximum watcr usege. The maximum <br /> daily water consumption using this calcutation is 40,725 Gallons per day, This is a 7 day average usage, <br /> Fa.:(20G�625�9133 however the water usage for pracessing is .•eriable from 5 to 7 days weekly. The daily average use on a <br /> yearly besis is significantly lower than the amount shown es tha maximum deiiy usage. Further,it is <br /> believed that the actual maximum daily usage wiU]ikely decrease due to the e�ciencies created by <br /> combining facilities, By considering these two factore,it is aaticipated that this total water usage will <br /> eccommodate some arnount of future growth,without exeeeding the initinl Gallons per Day as shown. <br /> The allowable sewer discherge for the site acreage is significantly greater than the current discharge <br /> requirement based on water use. However,due to the potential in the fuhue to exceed the current stated <br /> usage,we heve decided to increase the design siu of the pn treetrnent vault to 110,000 GPD to avoid the <br /> cost of replacement in the future,should this capacity ever be reached. <br /> T'hank you for your cooperatioa in this matter and I look forwazd to a successtL�resofution to Utis issue. I f <br /> you have any quosHons,or need any additional information,please do not hesitete to call me(a3(206)728- <br /> 4560. <br /> Sincerely, <br /> : � C\-`Vi�O ' <br /> Darren Peugh <br /> Intracorp Real Estate <br /> CC: Mark Donison, Port Chathum <br /> John Solberg, Vice President, Inhacorp <br /> File <br /> � <br />