Laserfiche WebLink
. LL� <br /> i <br /> i <br /> � <br /> � <br /> � <br /> ��� i <br /> � <br /> �yy <br /> ��� <br /> �C�� <br /> (A M <br /> x <br /> o�� � <br /> � �8 , <br /> Q1-�Y (7 i <br /> ;H� INFORMATION FOR DEVELOPER: � <br /> �. <br /> H H 1. ^ity streets and alleys are to be kept clear of dirt and debris <br /> � H o_ all times during construction. Dust suppression and street <br /> n�G° cleaning must occur as directed by the Public Works Inspector. { <br /> � � I <br /> y�p 2. Performance guarantees are required for street and ut.ility <br /> o� improvements. � <br /> � I <br /> 3 . Permits must be cbtained for all fill removed from the site and <br /> placed within the City limits. It takes about 35 days (a SEPA � <br /> review) to obtain permits for any specific site. There is ; <br /> currently a lack of adequate permitted fill sites within the <br /> City limits. � <br /> 4 . A one-year guarantee is required on the public improvements and � <br /> site landscaping for an amount not less than 10� of the cost of <br /> construction and/or installation and shall run for one year from <br /> the date of issuance of the first Occupancy Permit for the � <br /> project. � <br /> - � 5. A two-year guarantee is required for private retention/detention 'i <br /> �j� or other drainage treatment/abatement facilities serving areas <br /> `�� larger than one acre. <br /> I 6. The on-site watermain must be staked within an easement to the <br /> { �, City. The easement must be submitted to the City prior to the <br /> � C+ issuance of permits. <br /> i <br /> 7. As-builts of storm sewer, sanitary sewer, and water systems must <br /> . and <br /> � desi n and construction standard <br /> s <br /> er Cit <br /> be submitted Y 9 <br /> P <br /> I � specifications. <br /> � <br /> 8. GTE Northwest will provided service to this site. However, new <br /> telephone cable construction will 5e required in conjunction with <br /> acted cancernin <br /> the site development. GTE <br /> should be cont 9 <br /> �`�` construction schedules and telephone requirements. <br /> It is the developer's responsibility to provide a suitable <br /> O� combination of conduit and trenching and/or riser condu:t to <br /> �.�, accommodate GTE's network communicstions cable within the <br /> confines of the complex. Provided that an acceptable combination <br /> of conduit and/or trenching are incorporated into the project to <br /> � accommodate GTE's entrance cable, there will be no costs to the <br /> ��,�� developer for the cable. <br /> If a rearrangement of existing cables on premise or on the <br /> right-of-way is necessary, appropriate charqes will be estimated <br /> and GTE's Gua.ranty of Payment form will be forwarded to the <br /> developer for si.gnature. Prior to commencement of GTE's <br /> engineering for such rearrangement, a deposit will be required. <br /> To insure timely telephone service, GTE requests 90 days lead <br /> time for engineering, procurement, and installation of cable and <br /> 9 - <br />