My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2215 MERRILL CREEK PKY BASE FILE 2018-01-01 MF Import
>
Address Records
>
MERRILL CREEK PKY
>
2215
>
BASE FILE
>
2215 MERRILL CREEK PKY BASE FILE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2018 3:55:43 PM
Creation date
2/25/2017 10:12:59 PM
Metadata
Fields
Template:
Address Document
Street Name
MERRILL CREEK PKY
Street Number
2215
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. LL� <br /> i <br /> i <br /> � <br /> � <br /> � <br /> ��� i <br /> � <br /> �yy <br /> ��� <br /> �C�� <br /> (A M <br /> x <br /> o�� � <br /> � �8 , <br /> Q1-�Y (7 i <br /> ;H� INFORMATION FOR DEVELOPER: � <br /> �. <br /> H H 1. ^ity streets and alleys are to be kept clear of dirt and debris <br /> � H o_ all times during construction. Dust suppression and street <br /> n�G° cleaning must occur as directed by the Public Works Inspector. { <br /> � � I <br /> y�p 2. Performance guarantees are required for street and ut.ility <br /> o� improvements. � <br /> � I <br /> 3 . Permits must be cbtained for all fill removed from the site and <br /> placed within the City limits. It takes about 35 days (a SEPA � <br /> review) to obtain permits for any specific site. There is ; <br /> currently a lack of adequate permitted fill sites within the <br /> City limits. � <br /> 4 . A one-year guarantee is required on the public improvements and � <br /> site landscaping for an amount not less than 10� of the cost of <br /> construction and/or installation and shall run for one year from <br /> the date of issuance of the first Occupancy Permit for the � <br /> project. � <br /> - � 5. A two-year guarantee is required for private retention/detention 'i <br /> �j� or other drainage treatment/abatement facilities serving areas <br /> `�� larger than one acre. <br /> I 6. The on-site watermain must be staked within an easement to the <br /> { �, City. The easement must be submitted to the City prior to the <br /> � C+ issuance of permits. <br /> i <br /> 7. As-builts of storm sewer, sanitary sewer, and water systems must <br /> . and <br /> � desi n and construction standard <br /> s <br /> er Cit <br /> be submitted Y 9 <br /> P <br /> I � specifications. <br /> � <br /> 8. GTE Northwest will provided service to this site. However, new <br /> telephone cable construction will 5e required in conjunction with <br /> acted cancernin <br /> the site development. GTE <br /> should be cont 9 <br /> �`�` construction schedules and telephone requirements. <br /> It is the developer's responsibility to provide a suitable <br /> O� combination of conduit and trenching and/or riser condu:t to <br /> �.�, accommodate GTE's network communicstions cable within the <br /> confines of the complex. Provided that an acceptable combination <br /> of conduit and/or trenching are incorporated into the project to <br /> � accommodate GTE's entrance cable, there will be no costs to the <br /> ��,�� developer for the cable. <br /> If a rearrangement of existing cables on premise or on the <br /> right-of-way is necessary, appropriate charqes will be estimated <br /> and GTE's Gua.ranty of Payment form will be forwarded to the <br /> developer for si.gnature. Prior to commencement of GTE's <br /> engineering for such rearrangement, a deposit will be required. <br /> To insure timely telephone service, GTE requests 90 days lead <br /> time for engineering, procurement, and installation of cable and <br /> 9 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.