Laserfiche WebLink
� <br /> � <br /> � <br /> � 4; <br /> � <br /> '��� . _ <br /> Q � <br /> ��rn : .,�,,..:.:w,:�r,,_ - • . <br /> I <br /> � <br /> � <br /> .h�tl <br /> ��� <br /> ti1 yp� <br /> H C7 <br /> y�y��y DETII2MIHATION OF NON-SIGNIFICANCE <br /> H O SEPA 1186-89 <br /> 4• C) <br /> H REVISED JULY 28r 1989 <br /> H <br /> � y� <br /> g H DSSCRIPTION OF PROPOSAL: The proposed action is the issuance of � <br /> ��� Public Works and Building Permits to allow construction of a 44,540 , <br /> t+ square foot building containing 37,380 square feet of warehouse space i <br /> y and 7,165 squ3re feet of office space. Approximately 10,000 cubic <br /> �� feet of earth will be moved on site. Most of the site outside of the <br /> � Plative Growth Protection Easement Area will be cleared, inFi£tingfive ' <br /> area reserved for a future expansion of the building. Y � <br /> parking spaces are proposed. Future expansion on the site will Us i <br /> subject to subsequent SEPA reviews. , <br /> pgppppBNT: NORPRO c/o Kenneth Lonq , <br /> 220 W. Mercer St. #409 <br /> Seattle, WA 98119 ; <br /> LOCaTION: The site is located on Lot 3A of. Seaway Center. It is <br /> in the northeast corner of the intersection of Merrill Creek Parkway <br /> and 23rd Drive W. extension from Merrill Creek Parkway which was <br /> approved for construction in June 1989. <br /> ���� Cit of Everett Planning Dept. <br /> Lead Agency: Y <br /> � � <br /> Contact Person: Gary Doughty Phone: 259-8731 <br /> i �� <br /> ; � ,,••:..��;on *+Aa�ures• <br /> i <br /> ( The environmental impacts of this proposal are documented in the <br /> �� Environmental Checklist and other information on file with the City. <br /> "��► The listed requirements are placed in response tc our review of this <br /> information: <br /> ��►� AGHNCIES WITH J[1RISDICPION: Department of Wildlife HPA Permit may be <br /> required for any work in Narbeck Creek ar Merrill and Ring Creek. <br /> � ' 1�' MITIGI�TION OY ADVERSE IMPACTS BY 5;,PA <br /> 1. Development of this site must be in conformance with the approved <br /> Seawa�� Center Master Plan, as amended, SEPA 15-87. (SEPA General <br /> '_�..� Policies) <br /> `� <br /> 1 <br />