My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2215 MERRILL CREEK PKY NEXTEL ANTENNA 2018-01-01 MF Import
>
Address Records
>
MERRILL CREEK PKY
>
2215
>
NEXTEL ANTENNA
>
2215 MERRILL CREEK PKY NEXTEL ANTENNA 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 7:59:33 AM
Creation date
2/25/2017 10:16:38 PM
Metadata
Fields
Template:
Address Document
Street Name
MERRILL CREEK PKY
Street Number
2215
Tenant Name
NEXTEL ANTENNA
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LOME RAIN, WE SHINE. S�RMW/ITE� <br /> MANAOEMENT <br /> February 1G,2005 <br /> Santhosh Moolayil <br /> Jay Group Engineering <br /> 1927 5th Street <br /> Marysville,WA 98270 <br /> RE: Review of StormFille:T^+ Design for Nextel Tower project. <br /> This fs to document for the City of Evereri our revfew o(the plans and the proposed <br /> application of the StormFilter al this site as you have requested. <br /> Stormwaler Management, Inc. has reviewed the Stormfilter design for lhe Nextel Tower site. <br /> The storm drainage syslem for this proJect was designed by Jay Group Engineering of <br /> Marysville,WA. We believe the StormFilter'^^ is an appropriate water quality solution for this <br /> site. <br /> The designer reports an impervious drainage area of 0.37 AC.The water quality ftow rate was <br /> determined by Jay Group Engineei ing, using the Santa �arbara Urban Hydrograph method. <br /> The water quality design precipitation of.96"/24-hour was utilized in the basin model.The <br /> design water quality flow rale was delermined to be 0.0699 c(s.The calchbasin SLormFiller <br /> wilh 2 cartridges calted out on the plan will treat up to 0.067 cfs. For conveyance design <br /> purposes,the 100�year conveyance ilow ihrough the vault was determined to be 0,27 cfs <br /> using the basin model.Tliis flowrate is within the internal bypass/conveyance capability of <br /> the system.Thus,no extemal bypass structure is required.Uur syslems require periodic <br /> maintenance lo operale properly. Given typical rooftop/parking lot pollutant loading rates, <br /> Stormwater Management, Inc. recommends maintenance on an annual basis. <br /> The configuration of the StormFilter inlet and outlet pipes is acceptable. The system appears <br /> to be constructi�le and is located in order lo facilitate maintenance activities. In summary, <br /> this filter is eYpected to operate in accordance with Stormwater ManagemenCs design intent. <br /> However,Stormwater Management has not reviewed the hydraulics of the collection system <br /> upsLeam or downstream of the(ilter. <br /> Either you or the City's reviewer may conlact rne i!you liave any questions. <br /> Sincerel � '' <br /> � / ,% <br /> /i�/� �� r. <br /> r Joe Reidy � <br /> Project Designer <br /> 570pMWAlER MANAGEMENT, INC • 12021�B NE AIRPORT WAY. PORTLAND, OR 97220 <br /> PHONF: 800/548�4667 • FAX: 800/561�1271 • STORMWATEFINC.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.