Laserfiche WebLink
u <br /> CLOSBD CK NORR ORDERB REPORT <br /> Total. Utility Maintenance N,anag�ment Syr h.em page 1 <br /> Ob/18/199� <br /> Date Range :O1/09/1989 - OA/16/1995 <br /> CM Work Or�'er Range : 1001091070001 - UT2608- ' pattern :*101196730102 <br /> Item Range :<Blank> - WF122020001 <br /> Program ALL Function ALL Activity i+LL <br /> CM WORK ORDER ID: 7101196730102 Title: CONNECT 23RD DR W. & MERRILL CRK�`'A <br /> «DUPLICATE PRINTING OF THIS WORK ORDER» �`��� �,��`��, i I 1 � ti�t�._ �?�y.�/ <br /> Item ID: -- <br /> Location ID: -- Activity 673 <br /> rrogram 710 Function 119 <br /> Date Completed: 08/09/1995 <br /> Overall Craft: Assi ned to: <br /> Issued: 05/19/1995 Issued by: GJ 9 <br /> out of Service? NO Priority: Travel Time: 0. 00 Hr. <br /> Meter Reading: <br /> Downtime: 0 hours <br /> Status: <br /> Labor: planned Hrs Actual Hrs Cost <br /> Craft ID Name ---------- ---------- <br /> ------------------ ---------- <br /> ------------ - <br /> 0.00 6.00 98.16 <br /> WST BBA BRADLEYr BROCK A. 0.00 6.00 112. 02 <br /> EO CCL CRAIG, CHESTER L. 0.00 1.00 19.85 <br /> USW DJL DIIRR, JACK L. 0.00 6.00 73 .26 <br /> UL GW GOSS, DANNY JAMES 0.00 3 .00 73.95 <br /> SUP2 GJ GARZA, JOHN (NMI) 0.00 6.00 111. 18 <br /> EO PTN PINON, THPM.'�S N. 0. 00 1. 00 18•9z <br /> USW RCR RQSE, CECTL R. _____----- <br /> Total Labor Cost: 507.34 <br /> Materials: Date # Used Cost <br /> Ip Description ________ ___----- -- <br /> --------------- -' -- 2 104.42 <br /> COUP46047147 COUPLING 8" I. X 8" MJ CI-DI 06/30/1995 1 <br /> METE34141847 METER 5/8" X 3/4" NEPTUNE OS/09/1995 100. 00� <br /> N/A 8" MJ KIT (FROM STOCK) 06/30/1995 4 5 <br /> N/A BLEACH (FROM STOCK) 06/30/1995 4 __________ <br /> Total Material Cost: ���43 <br /> /^70 /� <br /> vehiclea: Hours Cost <br /> Ip Description __________ <br /> ------------ <br /> ------------------------------ <br /> ------ <br /> 3. 00 15.0 <br /> V0017 94 FORD AEROSTAR VAN 1.00 4.40 <br /> V2032 89 CHEV 5-15 6.00 31.80 <br /> V2156 89 DODGE 1 TON ___,_______ <br /> Total Vehicle Cost: 51.20 <br /> Work Description: -------------------------------'-" <br /> ----------------------------------------- <br /> A .�, .�...., <br />