My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2300 MERRILL CREEK PKY J L MANUFACTURING 2018-01-01 MF Import
>
Address Records
>
MERRILL CREEK PKY
>
2300
>
J L MANUFACTURING
>
2300 MERRILL CREEK PKY J L MANUFACTURING 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 8:59:43 AM
Creation date
2/25/2017 10:26:35 PM
Metadata
Fields
Template:
Address Document
Street Name
MERRILL CREEK PKY
Street Number
2300
Tenant Name
J L MANUFACTURING
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2009 Washington Stalr�nergy Code Compliance Forms lor Nonresiden�ial-�d Mullifamily Residential <br /> . _ . <br /> ' ' � RevisedDerembe�2010 <br /> 20n9YJaslungtonStatcEicrgyCotleComphanmPortnsforNonresidentialantlAluliAam�.�yF7e5i4enUal Ddle 11/19/2012 <br /> PfUjCClAdtlfCSS ]]00 Merrlll creek P�rkwey <br /> The lollowinq inlormalion is necessary to check a mechanical permit application br compliance with ihe mechanical requirements in Iha <br /> WashinglonSlatc Nonresidential Energy Cotle. <br /> Lxation Building Depatlment <br /> �pplicability Codc on Plans Notes <br /> ( es.no,na) Section Componem Inlormal�on Required <br /> HVAC REOUIREMENTS Sections 1401-1424 <br /> 7q�� EqulpmentPeAormance Hl <br /> xee 1411.1 Minimum ellicienc, E,uipment schedule vnth type,capacity,��Iliciency <br /> N.x. 1411.1 Combustion M�. Indicate inlermitteM ignition,Ilueldralt dan per 8 jacket loss <br /> i <br /> fl.A. 1411.1 Air-cooled ehiller Pmvide total air and water chiller capacity <br /> �.A. 1411.2.1 Water�co.�led chiller Full�load and NPLV values adjusted lor any non-standard conditions i <br /> N.A. 1411 4 Pkg.elec.htg.8 clg. Lie�heat pumps on schedule I! <br /> tt.r. 1411.5 Unenclosed Heat Intliwle radiant heat system and occupancy cornrols <br /> � <br /> r <br /> 1q12 HVAC Conlrols <br /> N.A. 1412.7 Temperature zones Indicate localions on plans H1 (I <br /> Yea 1412.2 Deadband conlrol Indicate 5 tlegree tleadband minimum <br /> fl.A. 1472.3 Humidity conlrol Indicale humidistat i <br /> xee 1412.4 Selback and Shutofl Intlicata thermostat vnlh 7 day pwgram capa6iliry 8 required setback <br /> MI I <br /> N.A. 1412.4.1 Dampers Indicate damper location,IeaY.age ra1e,comml type,8 max.leakage <br /> N.a. 1Al2.42 OptimumStart IndicaleoptimumstartcoNrols <br /> N.A. 1472.5 Heat pump control Indicate heal pump thermostant&outdoor lockout on schedule <br /> N.r. 1J12.6 Combustion heating Indicate modula6ng or staged coMrol H7 <br /> vue 14127 Balancing Indicale balancing leawres on plans <br /> N.A. 1412.8 Ventilation Comrol Indiwte demand comrol ventdalion for high�occupancy areas <br /> N.A. �,i12 9 �oading Dak& Ind�cate enclosed loading dak 8 parking garege ventilation syslem <br /> Gara e Ventilation activalion and coNrol method. <br /> N.A. 1422 Thermoslal interlock Indicate Ihermostat inlerlock on plans <br /> N.x. 1432.2.1 Temperalure P.esei Intlicata temperalure resel method <br /> 1413 Alr I Waler Econemircrs <br /> N.x. 1412.1 Single zone systems InAicate mul'iple cooling stage coNrol wpability. Ml <br /> xee 1413.1 Air Econo Operation Indca�e 100°o capability on schedule <br /> N.A. 1413.7 Wir Econo Operation Indicate 100°o capacity at 45 degF db 8 40 deg F wb � <br /> Indicale max.OSA condition for design clg load 8 equipment <br /> N.A. 14132 WIr Econo Documen Pedormance data. <br /> e7.7.. 1�13.3 Inlegrated operation Indicate capabilily lor panial cooling <br /> N.A, iJ13.4 HumidificaGon Indicaledirectevaporlogatomizationwfaireconomizer � <br /> 1 <br /> 1q14 Oucting Systems <br /> N.A. 1414.1 Duct sealing Indicate duct design pressures.sealing,and testing requiremems <br /> a.A. 1414.12 Low press.ducl test Indicato applicable low pressure ducl systems shall be leak tesled � <br /> Indicate high pressure duct syslems shall 6e leak tesled,and identify <br /> N.n. 1414.1.3 Hiph press.duct test �he location ol Ihis ductwork on lans <br /> N.A. 14142 Ducl insulation Indicate R�value ol insulation on ducl <br /> 1475 Plping Systems � <br /> N.A. 1415.1 Piping insulation Indiwte R-value ol insulation on piping <br /> �q76 omp et on equ rements <br /> MI <br /> vee 1416.32 System Balancinq Indicale air and water system balancing requirements Hi <br /> veu 1416.3.3 Functional Testing Provide sequence ot operations and test procedures. <br /> M1 <br /> xee 1416.3.4 Documentation Indicate 08M manuals,record dravnngs,stall training M1 <br /> Yee 141G.3.5 Comm.Report Indicate requiremeNs br tinal commissioning report <br /> t+.n. 1476.4 Compliance Chklist Submil to building otlicial upon substantial completion. <br /> Completed and auached. Equipment schedule wilh types,inpuVoutput. <br /> v�u Mech�nlwi Summory Form elliciencv.chn,h ,eronomizer <br />
The URL can be used to link to this page
Your browser does not support the video tag.