Laserfiche WebLink
LANCE M�ELLER 6 ASSOCIAIE� <br /> Ln c H i r � c r s • n i n <br /> i� c� ��>k�-o � z <br /> Se!�tember 27, 2005 <br /> Tony Lee <br /> Plans examiner <br /> City of E��erett Planning a�,d Community Development <br /> 3000 Cedar Street <br /> Everett, \NA 98201 <br /> RE: Apptied Technical Services T.i. at Merrill Creek Center, <br /> Permit#0508042 <br /> Dear Tony, <br /> I have attached two copies of the revised areas to our previously permitted pl�,n set. I have <br /> clouded the revisions and provide a brief description of the changes below. <br /> 1, We have added an exterior patio with a tube steel fence. The design is the same as the <br /> enclosure around the old Solectron Cafeteria patio. The door would be provided with panic <br /> hardware similar to the existing patio door/gates. See detail 16 &21lTA2.5 <br /> 2. We eliminated a concrete ramp at the existing saw tooth loading dock. We added a new <br /> overhead drive in door and ramp for the yet to be leased vacant spacc. See sheet TA2.0 <br /> and structural detaiis. See sheet TA3.0 for elevation. <br /> 3. We are going to demolis'� the men's portion of the rear restrooms on the vacant lease <br /> space. <br /> 4. We added a new wall section J1 for the demising wall between Signtech and the vacant <br /> thes oof aWe needed to show a meanstof9oggi�ng the wail beicv lhe conlduiWaSeef sheetto <br /> TA2.4. <br /> If you have any questions or need for additional information, please call me at 206-325-2553. <br /> Thank you, <br /> �I� . <br /> Harold Christensen <br /> Architect <br /> Lance Mueller&Associates <br /> Cc: Ron Greene', Washington Hoidings <br /> Mark Barbieri, Washington Holdings <br /> 130 Lakeside Suite 250 Seattle,WA 98122 ^ 206 325-2553 Fax 206 328-0554 <br />