My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6300 MERRILL CREEK PKY BASE FILE 2018-01-01 MF Import
>
Address Records
>
MERRILL CREEK PKY
>
6300
>
BASE FILE
>
6300 MERRILL CREEK PKY BASE FILE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 9:59:36 AM
Creation date
2/25/2017 10:39:20 PM
Metadata
Fields
Template:
Address Document
Street Name
MERRILL CREEK PKY
Street Number
6300
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
689
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> i� <br /> r <br /> � Section One <br /> nc,�ed to be detained, but it does need to be trcated for water quality. <br /> Stormwater water quality treatrnent will be accomplishcd using a <br /> wetpond «7th an open water cell and a wetland treatrnent cell. The <br /> I wetpond was sized for the volume of the 6-month stortn. 7'}re higher <br /> storm flows will pass tivough the wetpond and will be discharged <br /> directly into the mgional detention pond. Sce Appendix C for the <br /> I Watenvorks calculations for sizing the wetpond volume. Also <br /> included in Appendix C are the calculations for sizing the open <br /> water cell and the wetland trcatment cell. <br /> IStortmvater flow from the building rooftops dces not need to be <br /> detained or treated for water quality. This stormwater will be <br /> I conveyed in a separate stormwater system from the parking and <br /> landscape conveyance system. The conveyance system for the <br /> rooftop drainage from the future building will also discharge <br /> 1 directly into the regional detention pond. During the first phase of <br /> development, the fiiture building pad area will be covered by <br /> asphalt treated 63se. Parking will not be allowed on �he iuture <br /> ' building pad area and it will have curbing or 3:1 slopes surrounding <br /> the area to prohibit vehicle access. When the £uture building is <br /> constructed, the temporaary drainage system will be removed and <br /> the downspouts will be comected to the conveyance system that <br /> t discharges dircctly to the regional detention pond. <br /> The stortnwater runoff that «ill be dischargcd into the native <br /> , growth protection area will be detained and treatcd for water <br /> quality. This will be accomplishe�: by the use of a combination <br /> wetpond and detention pond. The �vetpond was sized to treat the <br /> � volume of the 6-month storm and includes the use of an open water <br /> cell and a wetland treatrnent ccll. The 100-year scortnwater runoff <br /> was designed to detain and release at I/2 the pre-developed 2-year <br /> Ipeak flow rate. Sce Appendis D for the Watenvorks calculations <br /> � for sizing the wetpond volumc. Also included in Apprndix D are <br /> the calculations for sizing the open water cell and the wetland <br /> � treatrnent cell and the orifice calculations and level pool routing. <br /> All of the stortmvater conveyancc systems have been sized by the <br /> � use of the rational method for the 25-year, 24 hour stortn. See <br /> Appendix E for the basin maps for the three conveyance systems <br /> and their respective rational analysis. <br /> I <br /> I O!her Permlts A National Pollutant Discharge Elimination System(NPDES) <br /> Permit is required for this site development. <br /> i <br /> SofectmnCorporotionLotlFo/'SeawavCenter i•IPrqectll93401011wordlSLR1FDRNdoc � <br /> It&NPncfc Novrmbcr7, 1997/poge9 � <br />
The URL can be used to link to this page
Your browser does not support the video tag.