Laserfiche WebLink
r <br /> i� <br /> r <br /> � Section One <br /> nc,�ed to be detained, but it does need to be trcated for water quality. <br /> Stormwater water quality treatrnent will be accomplishcd using a <br /> wetpond «7th an open water cell and a wetland treatrnent cell. The <br /> I wetpond was sized for the volume of the 6-month stortn. 7'}re higher <br /> storm flows will pass tivough the wetpond and will be discharged <br /> directly into the mgional detention pond. Sce Appendix C for the <br /> I Watenvorks calculations for sizing the wetpond volume. Also <br /> included in Appendix C are the calculations for sizing the open <br /> water cell and the wetland trcatment cell. <br /> IStortmvater flow from the building rooftops dces not need to be <br /> detained or treated for water quality. This stormwater will be <br /> I conveyed in a separate stormwater system from the parking and <br /> landscape conveyance system. The conveyance system for the <br /> rooftop drainage from the future building will also discharge <br /> 1 directly into the regional detention pond. During the first phase of <br /> development, the fiiture building pad area will be covered by <br /> asphalt treated 63se. Parking will not be allowed on �he iuture <br /> ' building pad area and it will have curbing or 3:1 slopes surrounding <br /> the area to prohibit vehicle access. When the £uture building is <br /> constructed, the temporaary drainage system will be removed and <br /> the downspouts will be comected to the conveyance system that <br /> t discharges dircctly to the regional detention pond. <br /> The stortnwater runoff that «ill be dischargcd into the native <br /> , growth protection area will be detained and treatcd for water <br /> quality. This will be accomplishe�: by the use of a combination <br /> wetpond and detention pond. The �vetpond was sized to treat the <br /> � volume of the 6-month storm and includes the use of an open water <br /> cell and a wetland treatrnent ccll. The 100-year scortnwater runoff <br /> was designed to detain and release at I/2 the pre-developed 2-year <br /> Ipeak flow rate. Sce Appendis D for the Watenvorks calculations <br /> � for sizing the wetpond volumc. Also included in Apprndix D are <br /> the calculations for sizing the open water cell and the wetland <br /> � treatrnent cell and the orifice calculations and level pool routing. <br /> All of the stortmvater conveyancc systems have been sized by the <br /> � use of the rational method for the 25-year, 24 hour stortn. See <br /> Appendix E for the basin maps for the three conveyance systems <br /> and their respective rational analysis. <br /> I <br /> I O!her Permlts A National Pollutant Discharge Elimination System(NPDES) <br /> Permit is required for this site development. <br /> i <br /> SofectmnCorporotionLotlFo/'SeawavCenter i•IPrqectll93401011wordlSLR1FDRNdoc � <br /> It&NPncfc Novrmbcr7, 1997/poge9 � <br />