Laserfiche WebLink
uc�_ io � yr ie��e r% ��+�urru�i ���rr�x-.Miiur� ve� evh �:.� IV 714ek37�Ir�.riJ r.yu��v <br /> ,• <br /> . <br /> 2. Upon submittal of an application for a second <br /> buildins on the site, or Nov,13, 2002 (fivc years from the issuance of <br /> thc Phase 1 building pemut), the applicant for the second building will <br /> conduct daily driveway counts for a one-wcek period on the site to <br /> determine an avcrage weekday pm peak trip generation level. The <br /> contractor and methodology used to obtain these counts shall be approvcd <br /> by the C3ty's Trs►ftic Engineer. In the event the average pm peak hour <br /> driveway count excceds 253 trips,the applicant will pay an additional <br /> fee based on S1006 per trip for the difference betwecn trips measured <br /> and 253. <br /> 3. The uaffic mitigation fee for thc second development <br /> phase will be based on thc 1TE trip generation rate for light industrial <br /> use based on square footage of developmen�taken from the Trip <br /> Generation Manual that is current at the time of the second phase <br /> application. <br /> 1he applicant bclieves that this is a fair and equitable moans to allow <br /> development of thc propc:rt;�to bcgin,and fot Solectron to Uegin <br /> � operation. . <br /> Sincerely, <br /> � \ <br /> d-.�..�.�.,t,� <br /> �a)i�/q7 <br /> I <br />