My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2234 MONROE AVE 2016-01-01 MF Import
>
Address Records
>
MONROE AVE
>
2234
>
2234 MONROE AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 5:19:26 PM
Creation date
2/26/2017 12:07:46 AM
Metadata
Fields
Template:
Address Document
Street Name
MONROE AVE
Street Number
2234
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />PUBLIC WORKS PERMIT COMMENTS <br />�l. As per Public Works approved plan dated <br />5. Connect side sewer per City Standard #601. <br />� Connect side sewer per City Standard #'s 601, 602, fiO4. <br />7. Connect all rooftop downspouts to the side sewer. <br />8. Connect rooftop downspouts to the drainage system provided for this lot. <br />� 9. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br />Storm Manual 3-2.6.2. Width �., Depth �, Length ZI '. <br />10. A catch basin as per City Standard Ptan #402 with a gas trap per Standard Plan t�410 is <br />required for the parking area. <br />11. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br />& 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br />driveways and any broken or damaged area must be replaced): <br />12. Instali a Type I concrete driveway per City of Everett Standard #307. <br />13. Pave driveway from the front property line out to the street paving. <br />14. Contact the . _ Water District for connecting provisions for this building's <br />water and sewer sarvices. <br />15. If a sewer pump system is to be installed, the pressure line must discharge into a private <br />manhole, then gravity flow across the public riyht-of-way. <br />16. The contractor must meet with the Public Works Inspector to discuss potential drainage <br />routing prior to beg;nning the project. <br />17. A sprinkler system is required for this building in compliance with the requirements of NFDA <br />Standards 13D. <br />f� /'-�LL G—�C�V�.-f�. D r�-1 P�T'CE ��L �" �n ry� I=o�tiDnTJeA <br />5� OC'ct�/-:L�' ,[�i�! �'�cc.Cc•c� S rrla�.[, �3 E H+1uLL;1� To A-itJ <br />� • ri2/! �: ��� 'S i � /v�C ,.c.� �f-5z�'U C� D � /%I�1T��/.S�L <br />f�"I�l��Ll-c'7� /� � <br />e n -1-�u �viu>iN�j �-� . <br />? �.3�1 Wlo�e-�� �c� <br />
The URL can be used to link to this page
Your browser does not support the video tag.