Laserfiche WebLink
INSPECTION REPORT %< <br />� Addre�s —,7'i_ 1_oC�v �Cry�rp-e <br />Contractor___ ►`I'�S_�_______ <br />�� / � <br />Owner <br />Date -- O� _� �7='_I_�C <br />•• s• _ <br />IAL APPROVAL <br />� VIOLATION �ORR�CTION REQUESTED <br />� Corrections listed below PAUST BE MADE 6efore work can be approved. <br />� Please contact inspector and arrange for appoimment. <br />� Was not able to perlcmi inspeciion. <br />ALL 259-8810 FOR REINSPECTION - 2d hour notice required <br />A RTIFICATE OF OCCUPANCY SHNLL BE ISSUED AND POSTED <br />ON THE PREMISES PRIOR TO OCCUPANCY. <br />Inspeclor <br />TYPE OF INSPECTION REQUESTED <br />J Temp. Elect. J Framing ..I Gas Pipin <br />J Fooling J D��wall, Nailing J Consultation <br />J Foundation J Shear Nailing J Groundwork <br />J Ductwork J Grid J Sirucl. Slab <br />J Wood Stove �Rough-in J Final <br />J Masonry J Service J Insulation <br />J Other__ <br />J BLDG: Pm�. No. _ MECH: Pmt. No.�- t'O� 1 <br />J[LEC: Pmt. No. _ J PLBG: Pmt. No. <br />