Laserfiche WebLink
PUBLIC WORKS PERM4T COMMENTS <br />q, Contact the Public Works Inspector (call ) to disc�ss the project pnor to beginning work. <br />q. Connect side sewer per City Standard #601. <br />5. Connect side sewer per City Standard #'s 601, 602, 604. <br />6. Connect all rooftop downspouts to the side sewer. <br />�7 <br />Connect rooflop downspouts to the drainage system provided for this lot. <br />RooHop runoff must be discharged to a roof downspout infiltration system per City of Everett <br />Storm Manual 3-2.6.2. The approximate size trench is 3.5' wide, 2' deep and 25' long. See <br />attachmenl for more details. <br />The contractor must meet wilh the Public Works Inspector to discuss potential drainage routing <br />prior lo beginning the project. <br />Install erosion control measures as determined by the Public Works inspector, such as silt fence, <br />straw bales, swales, or erosion blankets. <br />Install erosion conlrol measures per Cily of Everett Standards for small parcels <br />Remove erosion control measures upon completion of the project prior to final approval of the <br />permit. <br />All e,.cavated material from toundalion, sidewalk and driveways shali be hauled to an approved, <br />permitted sile. No wasting of material is allowed on this building lot. <br />No dirt, mud, rocks or debris to be tracked onto road�vay. <br />No building materials to be stacked on sidewalklroadway and sidewalklroadway to be kept clean <br />and open for pedestrian travel. <br />Adjust water meter box 1" above sidewalk grade. <br />Femove and replace curb, gutter �nd sidewalk as per City of Everett Standard Plan #'s 305A & <br />306 on ihis proposal's frontage as directed by the Pubiic Works Inspector (i.e. all unused <br />driveways and any broken or damaged area must be replaced). <br />Install a Type I concrete driveway per City of Everett Standard #3U7. <br />19. Fave driveway from the front property line out to the street paving. <br />�-` 20��� Co tact the�� �f'/�r�C Water District for connecting provisions for this building's \ <br />���_—' �sewerservices. <br />�� <br />21. A catch basin as per City Standard Plan #402 wilh a gas trap per Standard Plan #410 is required <br />forthe parking area. <br />22. If a sewer pump system is to be instalied, the pressure I�ne must discharge into a private <br />manhole, Ihen gravity flow across the public righl-of-way. <br />