Laserfiche WebLink
�J�A `� <br />WHITELEY JACOBSEN AND ASSOCIATES <br />ARCHITECTS / ENGINEERS / PLANNERS <br />7U6 Sealtle Tower 1218 Third Avenue SeatUe, Wp 98101 <br />Telephone (206) 623-0331 FAX (206) A67.8441 <br />13 March 1990 <br />The City of Everett <br />Attention: Jeff Heilman <br />3200 Cedar <br />Everett, WA 98201 <br />Subject: eoundation taall <br />Permit #23733 <br />Pacific Harbor Construction <br />5028 Narbeck Avenue <br />Dear Mr. Heilman: <br />� <br />9031 <br />��c�o��� <br />� MAR 14 19:30 <br />. .. .. ................. ........................... <br />CITY OF EVERETT <br />Public �Norks Dept. <br />On Monday, March 12, 1990 I observed ttie foundations under construction at the <br />subject jobsite. <br />The foundation wall on the west elevation is shown on the drawings as an 8 foot <br />high wall with a key at the base of the footing, This wall will be constructed <br />as a cantilevered retaining wall which will be 1 feet in height. This <br />alternative is structurally sound since it has been redesigned with a 4 foot <br />wide foundation. I recommend that the foundation as constructed be approved. <br />Very truly yours, <br />WJA� P,S. <br />P.rchitects, Engineers, Planners <br />Jack H. Whiteley, P.E, <br />Structural Engineer <br />ec: Mr. Ron Rudge, President <br />Pacific Harbor Construction, Inc. <br />10325 Davies Road <br />Lake Stevens, I9A 98258 <br />