Laserfiche WebLink
-, <br />J <br />CLOSED CM WORK ORDERS REP�RT <br />City of Everett Total Utility Maintenance Management System pa9e 1 <br />03/11/1994 _________—�_-_ <br />----�-------__�_____--- <br />___�__�------ <br />Date Range :03/O1/199<Biank>09�a405421080229 <br />� Work Order Range <br />Item Range :<Blank> - wF122�20001 <br />_ rrT. Function ALL Activity ALL <br />rtvy...... '"-- amancc._�---_. <br />=sxevea--ct-ac�ssnaa��soc-cce <br />�tDUPLICp+TEEPRINTINGo F9THIS7WORK ORDER»�CATE <br />Item ID: WS3594X025 -- WATER SERVICE <br />I,ocation ID: �nction 119 <br />Program 740 <br />Date Completed: 03/02/1994 <br />Overall Craft: <br />Issued: 03/O1/1994 <br />out of Service? NO <br />Meter Readingo hours <br />Downtime: <br />Status: <br />Labor: <br />Craft ID Name <br />WST 1�� <br />WST SRJ <br />Issued by: <br />Priority: <br />MOORE, KIM C. <br />STENSETii, ROBERT J. <br />Materials: <br />ID <br />ADAP34000547 <br />ADAP34000547 <br />BOX000056247 <br />BOX000056247 <br />COUP34004647 <br />COUP34004647 <br />COUP34142747 <br />gLIA34101447 <br />gIS,034104247 <br />METE36089447 <br />N/A <br />PIPE34060647 <br />gE"r'P34033647 <br />gETf34033647 <br />Pattern :7401196750785 <br />Pattern �* <br />5101 NARBECK P+vL <br />pctivity 675 <br />SKL Assigned to: <br />Travel Time: 0.00 Hr. <br />Planned Hrs Actual Hrs <br />0.00 6.00 <br />0.00 6.00 <br />Description __________ <br />ADAPTER 3/4" MIP X INSTA-TITE@ <br />ADAPTER 3/4" MIP X INSTA-TITE@ <br />SOX METER PI+P+ 15° X 10" F7/LID <br />BOX METER PLA 15 <br />COUPLiNG 3/4" ANG MET X FIP F? <br />COUPLING 3/d" ANG MET X FIP @ <br />COUPLING 3/4" CTS COMP X MIPT@ <br />gLL 3/4" 90 DEG BRASS . <br />EI,I, 3/4" STREET BRASS <br />METER 5/8" � N� RF.MOTE READER <br />METER JIII+IFER (FROM STOCK) <br />PIPE 3/4" P�LY I.P.S4�� �TH15" <br />SETTER COP 5/a�� X 3/4" ° <br />SETTF.R COP 5/ " I+GTH15 <br />Work Description: <br />METER# 11122 <br />Total cost for work order 7401196750785: <br />Total Labor Cost: <br />Date # Used <br />-------2 <br />03/02/1994 4 <br />03/04/1994 1 <br />03/02/1994 1 <br />03/04/1994 1 <br />03/02/1994 1 <br />03/04/1994 1 <br />03/04/1994 1 <br />03/04/1594 1 <br />03/04/1994 1 <br />03/04/1994 . 1 <br />03/02/1994 2 <br />03/04/199ti 1 <br />03/02/1994 1 <br />03/04/1994 <br />Total Material Cost: <br />Cost <br />118.38 <br />117.54 <br />----235.92 <br />Cost <br />16.12 <br />32.24 <br />12.34 <br />12.34 <br />4.21 <br />4.21 <br />5.27 <br />1.55 <br />2.06 <br />27. <br />0.00 <br />47.78 <br />47.78 <br />213.61 <br />--------------------- <br />449.53 <br />�� <br />