My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4003 NASSAU PL 2016-01-01 MF Import
>
Address Records
>
NASSAU PL
>
4003
>
4003 NASSAU PL 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2017 1:48:38 AM
Creation date
2/26/2017 1:07:04 AM
Metadata
Fields
Template:
Address Document
Street Name
NASSAU PL
Street Number
4003
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NELSON <br />GEOTECHNICAL <br />ASSOCIATFS, INC <br />173I 1 135TH Ave. NE NA-500 <br />Woodinville. WA 98072 <br />(4?S) 4861669 FAX 46I-2510 <br />FIELD REPORT <br />ProjecC <br />Owner: <br />;�;:Y�=�� b03 NA�ss u� <br />Kvernmo Residence <br />Location: <br />Weather: <br />Pu�pose of <br />Visi[: <br />Jon Kvaenmo <br />Everett <br />50's and Overcast <br />Monitor Pin Pile Installation <br />t�� <br />File No.: 3561B02 <br />Date: 11/8/02 <br />Repon No: 7 <br />Page: 1 of 3 <br />By: ADJ <br />We visited the project site today at the request of Jon Kvernmo for the purpose of monitoring pin pile <br />installation. <br />Upon arrival, we met with Jon. We observed the contractor install fiheen pin piles today. Eight of the <br />piles were battered at approzimately 15 degrees while seven were driven vertically. The approzimate <br />pile locations are shown on the attached site plan. The pin pile depths, penetration dtuing the last 20 <br />seconds of driving, and degree of batter are shown on the attached table. <br />:'he gin piles were driven with an 1,100 ft.lb hammer (Teledyne TB 425). Four-inch diameter steel pipe <br />sections �p to 21 fcet long wero used and coupled with slip couplers. The piles wero driven until a <br />n;fusal criteria of up to 1 inch of penetration during 20 seconds of driving was attained. <br />Baeed oa onr observations. it is our opinion that the fifteen pia piles observed today 6ave ban inataped <br />in amo�dtnoe with om recomn►eadatioas. and should P�'�vide t�e pl�nned 10 tons of s�pport. <br />Atcachments: Site Plan, Table <br />Distribution: <br />Signed: _ �i�-�" X�--� <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.