Laserfiche WebLink
t� <br />PUBLIC WOf�iKS PERMiT COMMENTS <br />4. As per Public Works approved plan dated <br />5. Connect side sewer per City Standard #601. <br />�6 Connect side sewer per City Standard #'s 601, 602, 60a. <br />� Connect all rooftop downspouts to the side sewer. <br />8. Connect rooftop downspouts to the drainage system provided for this lot. <br />9. Rooftop runoff must be discharged to a ronf downspout infiltration system per City of E��srett <br />Storm Manual 3-2.6.2. Width _, Depth _, Length _. <br />10. The contractor must meet with the Public Works Insaector to discuss potential drainage <br />rout:ng prior to beginning the project. <br />11. Install erosion control measures as determined by the Public Works inspector, such as silt <br />fence, straw bales, swales, or erosion blank�ts. <br />12. nstall erosion control measures per City of Everett Standards for small par:•els <br />13) Remuve erosion controi measures upon completion of the project prior to final approval of the <br />permit. <br />�All excavated material from foundation, sidewalk and driveways shall be hauled to an <br />appreved, permitted site. No wasting of material is allowed on this building lot. <br />15.,Remove and replace curb, gurier and sidewalk as per City of Everett Standard Plan #'s 305A <br />& 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br />driveways and any broken or dama�ed are ust be replaced). <br />16. Install a Type I concrete driveway per City of Everett Standard #307. <br />17. Pave driveway from the front property line out to the street paving. <br />18. Contact the Water Oistrict for connecting provisions for this building's <br />water and sewer services. <br />19. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is <br />required for the parking area. <br />20. If a sewPr pump system is to be installed, the pressure li�e must discharge into a private <br />manhoie, then gravity flow across the public right-of-way. <br />21. A sprinkler system is required for this b�ilding in compliance with the requirements of NFDA <br />Standards 13D. <br />��/�//-� /I <br />PWComments �.�/ <br />4oc�3 /�%55r� U /�L <br />