My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3131 NASSAU ST ANKLE AND FOOT CLINIC 2018-01-02 MF Import
>
Address Records
>
NASSAU ST
>
3131
>
ANKLE AND FOOT CLINIC
>
3131 NASSAU ST ANKLE AND FOOT CLINIC 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2022 10:49:27 AM
Creation date
2/26/2017 1:30:13 AM
Metadata
Fields
Template:
Address Document
Street Name
NASSAU ST
Street Number
3131
Tenant Name
ANKLE AND FOOT CLINIC
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7/2712006 City of Everett Page 1 <br />2:26:3211Dt <br />INSPECTION ACTIVITY R;:PORT <br />Ilermil No. I30409-030 <br />Applied 9/222004 <br />Approved 4/21/2005 <br />Issued 5/2/2005 <br />Parent Permit <br />Site Address 3131 NASSAU ST <br />Applicant Lot <br />Owner CCJ PROPERTIES LLC Work <br />Contractor LEONE & KEEBLE INC Tract <br />Description NEW BUILDING FOR ANKLE& FOOT CLINIC <br />Notes <br />Scheduled Comnleted Tvne Insnector Result Remarks Insnccto:'s Comments <br />6/82005 6/8/2005 Footing BURDEN Approval Kr.¢en providing <br />Special Inspections <br />7/14/2005 7/14/2005 StructSlab BUDDEN Approval See notes North side slab on grade. <br />Kraran also providing special inspections. <br />9/9/2005 <br />9192005 <br />Froming <br />BUDDEN <br />Core Rcgd <br />Sec notes <br />1) Please provide details lire light gouge to <br />structural connections -- M of fasteners, <br />q Pc, cic. <br />2) Complete screws on both sides of <br />deflection tracks & base tracks. <br />3) Tighten nuts at structural iron <br />connections. <br />9/19/2005 <br />9/19/2005 <br />Framing <br />BUDD17N <br />Approval <br />See notes <br />Approval as noted: Per engineers revisions <br />& clarifications. <br />9/21/2005 <br />9/21/2005 <br />Framing <br />BUDDEN <br />PartialApproval <br />-North portion - <br />north ofcnlq <br />10/21/2005 <br />10/21/2005 <br />Grid, Bldg <br />BUDDEN <br />Approval <br />12/28/2005 <br />12/28/2005 <br />Final Bldg <br />IIUIITA <br />PartialApproval <br />Foot & Ankle TI <br />only, OK TCO <br />1/11/2006 <br />1/11/2006 <br />Final Bldg <br />BUDDEN <br />PtAppr-ConRcq <br />See notes <br />1) Provide disabled parking signage. <br />2) Provide final Special Inspections report. <br />3) Obtain Planning Dept approval. <br />4) Spiral stairnmy has not been installed at <br />lobby. <br />TCO pending per prior report. <br />7/26/2006 <br />7/262006 <br />Final" <br />BUDDEN <br />Approval <br />7/27/2006 <br />7/272006 <br />Other <br />SEC: NOTE RE C.O. <br />Per Cher)I of CCJ, this permit should have <br />only been for the building %silt a separate <br />CO for Ankle & Foot clinic. I advised <br />Ankle & Pont was never submitted as a <br />separate mad that would have to happen <br />along with a floor plan for Ankle & pool <br />before I can break out a separate CO - <br />probably a n ininuun building permit fee <br />(54.50) gb <br />INSPI2 <br />C7w <br />
The URL can be used to link to this page
Your browser does not support the video tag.