Laserfiche WebLink
,,, Bob Landles, Planning Department � ��Q <br />,,,�,�, Public Works Department C���1 � �� � <br />,,;,,, April 25, 198D <br />S.E.P.A. Checklist Review �12ll <br />Planning Eile U80-29 <br />PROPOSAL: <br />To construct a kidney clinic at the northwest corner of 33rd St. and Nassau Avenue. <br />RECOMMENDATIONS: <br />It is the recammendation of the Pubiic Works Department that issuance <br />of a Negative Declaration be subject to the following: <br />1. A detailed drawing shall be submiited to the Public Vf�orks Department <br />showing parking layout, landscaping, driveways, utilities, storm dreinage, <br />and ali required improvements to the public right-of-way. Public Works <br />pepartment approval of these drawings is required before any permits <br />are issued. All improvements shall be completed before the Occupancy <br />Permit is issued. <br />As-builts, easement, and a one year Warrantee Bond in the amount of <br />10% of the cost of construction of the public water syst: m are required <br />withln 10 v:orking �ays of obtaining public water connection. <br />2. City streets are to be kept dear of dirt and debris during opr.ration. <br />3� of Eve;e�tt shalltbe on alrter a streelts unless ortherW se approved by the�ty <br />pubie� Works Department. <br />4. SeQuued slong the frontage of the s te,rstreet acationyorrL.I.DcCovenant <br />required for Federal Avenue. <br />5. The fire marshall shall be tonsulted to determine the adequacy of the <br />existing static water pressure in the area to meet fire flow demands. <br />6. Participation in the program to fund the nocth end sanitary sewer inter- <br />ceptor is required. That fee is $1,OS3. <br />7� on�s te deten onffsedama temoval and a gas trap nrov ded.��u With <br />8, public Works Department approval of a temporary erosion control plan <br />is required before rnmmencing construction activities; Plan to also include <br />quality, quantity and location of fill. <br />9. Exposed soils must be reseeded within 30 tiays of construction completion <br />and between construction phases. <br />Amend Checklist As Follows: <br />II - 13 - b, c, d, and f- change to yes. <br />Information For 1'he Developer: <br />A fire hydrant is required within 200 driving feet but noi cic ser than 50 fE�et of <br />all buildings. <br />1� <br />