My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3317 NASSAU ST 2016-01-01 MF Import
>
Address Records
>
NASSAU ST
>
3317
>
3317 NASSAU ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2017 3:29:00 PM
Creation date
2/26/2017 1:41:22 AM
Metadata
Fields
Template:
Address Document
Street Name
NASSAU ST
Street Number
3317
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A & E Insulation, Inc. <br />15205 39th Avenue NE <br />Marysville, WA 98271 <br />Of(ice: (360) G51-1058 Fax: (360) 651-1259 <br />Websitc: www.acinsu�ation.com <br />Date:ll/25/13 <br />Air Leakage Testing (Blower poor Test) <br />Conditioned Floor Area: <br />Standard <br />55.0 ACHso <br />(�CF M� % 60) / Candi�ioned Volume) <br />Signa <br />��_�:nz�-.:-.� <br />Tested CFM <br />I'S'I �_3;_ <br />Calculated Volume (Cubic Feet) <br />21, 03� <br />Test Result (ACHso) <br />�� �Z� <br />Glossary <br />Pascal �pa): Unit ot pressure <br />CFA: Conditioned floor area in square feet <br />CFMso: Cubic feet per minutc of air leakage at 50 pascals of pressure <br />7otal Leakage: Aggregation of the entire systems duct leakage in a duct test. <br />Conditioned Volume: Volume of conditioned space (CFA X ceiling hieght) <br />ACH,o: Air changes per hour at 50 pascals of pressure <br />_ _Air Leakage Testing Code Language <br />_ _ - _ . ----.._.__ . ----_..____ _ _ ._ <br />R402.4.1.2 Testing, Thc building or dwelling unit shall be tested and verified as liaving an air leakagc rete of not <br />exteeding 5 air changes per hour. Testing shall be tondutted with a 6lower door at a pressure of 0.2 inches w.g. (50 <br />Pascals�. Where required by the codr oJTcial, tr.sting shal/6e cond�rted by on approved third party. A wiitten report <br />oJ the results of the test shall be signed b y the porty conducting the test and provided to the code oJ/icial. Testin5 <br />sholl6e perfoimed at any timc aJtcr creation o/all penetrations oJ the building thcrmol envclope. Once visual <br />inspection has con/irmedscoling (see Table R402.4.1.1 J, operable windows and doors manuJactured by small business <br />sball be permitted to be scalcd oJJ at thc frame prior to thc fesL During testing: <br />t. Exicrior windows and doors, (ireplacc and stuvc doors shall bc dosed, bul not scaled, bcyond Ihe intended <br />wCathcrstripping or other infihration r.ontrol measures; <br />2. Uampers indudmg exhiutt, mtake, makeup air, backdra(t and flue dampea chall be dosed, but not sealed beyond <br />intended inliltration conlrol measures; <br />3 Interior doors, i( installed , t tlie time of the test, shall be open, a[ce55 hatches to mndilioned trawl spates and <br />ronditioneJ altics shall be open; <br />4. [xtcrior openings for continuous ventllation systems and hcai recovcry vcntilators shall 6c dosed and sealed; <br />S. Healing and cooling systems, iF mstalled ai the time of the test, shall be IurneJ off; and <br />6 Supply and retum registers, i( installed al the limc o( thc test, shall he fuliy open. <br />HVAC duc�s supply and reWrn rcgistcrs shall not he scaled. <br />
The URL can be used to link to this page
Your browser does not support the video tag.