My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3427 NASSAU ST 2018-01-02 MF Import
>
Address Records
>
NASSAU ST
>
3427
>
3427 NASSAU ST 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2022 10:14:27 AM
Creation date
2/26/2017 1:51:40 AM
Metadata
Fields
Template:
Address Document
Street Name
NASSAU ST
Street Number
3427
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMPLIANCE <br />REQUIRED <br />INSPECTION IMPORTANT: Supply Information In the shaded area by checking the appropriate circles.. <br />APPflOVED� Disregard topics that don't describe your building oreWipment. BO NO.i place checks In <br />the two left columns. <br />• 0 <br />❑ ❑ r Slab Insulation (Table 6.1) shall be R-10 and located of <br />QA. Exterior (See INSULATION INSPECTION). OR <br />Qj B. Interior extending downward fro M the lop slab SO <br />,hodioirallyunder the slab for a totatdistaneebt: <br />❑ ❑ MOW Slab Insulation shah have Rd <br />0 and extend u _ <br />❑ Ela 8eiow grade masonry wall Insulation (S. SM1'AA0);6 <br />p A. Exterior and rated R•10 (See INSULATION PHAS <br />`OR <br />p B.Interlor(SeeINSULATION PHASE), <br />W, or VBnloaey 24P. <br />ri <br />der the smile slab(S: 5021.4.9) - <br />hall be full -depth and located on the: <br />E): <br />❑ ❑ a Thermal break(s) shell be placed In the slab (S. 602.1.4.5, 201.1: BUILDING ENVELOPS - - <br />between the conditioned and unconditioned spaces checked below, and extend from the top of the <br />slab tothe bottom, then underneath toward the conditioned space for a 24'total developed dlmension. <br />O dwelling/garage (Z) dwehlnWconnected space 0 slab edge and foundation wall. <br />❑ ❑ (DRadon mitigation system (VIAO, S. 602.1) shall be installed if One of the following la chocked: <br />O A. Net foundation ventilation area is less than 1 FT2 per 300 Ft2 of crawl space <br />O B. Foundation vents are closable. <br />O C. Under floor plenum acts as supply or return air duct <br />[WSEC Foundation phase requirements: <br />spected by: Date <br />❑ ❑ Lq All structural panels such as plywood, particle board, wafer board, and oriented strand boar( shall be <br />' tabled' EXPOSURE 1"fX-TERIOR' or'HUD -APPROVED* (VIAQ, S. 401.1). <br />❑ ❑ Lf r�D Insulation baffles shall be placed in ahics/ceilings to maintain at least 1' ventilation space and extend at <br />least 6- vertically above bans or 12'vertically above loosefll insulation (S. 502.1.4.5). <br />❑ ❑ r8GIazIng efficiency required under the selected option shah be (S. 502.1.5, 602.7.2, Table 6.1): <br />o s UA6 (Option 1) s U.43 (Options II) Of. U.40 (Option III, IV) <br />0s U.39 (Option V) s U.36(OpWn VI) O s U.35 (Option VII) O s U.32 (Option Vhl) <br />Symbols USed: =equa/s >greter then <less then r_ greater than or equal s less then or equal <br />UPDATCD SEPTEMELR teat <br />Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.