My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3431 NASSAU ST 2018-01-02 MF Import
>
Address Records
>
NASSAU ST
>
3431
>
3431 NASSAU ST 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 11:09:29 AM
Creation date
2/26/2017 1:52:42 AM
Metadata
Fields
Template:
Address Document
Street Name
NASSAU ST
Street Number
3431
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GES <br />Geotechnical <br />and Environmental <br />Services, Inc. <br />P.O. Box 1031 <br />Everett, Washington 98206 <br />425i359-7634 <br />\larch I, 2005 04-08-10 <br />Mr. 0 J. Spence <br />2720-210" St SW <br />Lynnwood, Wa. 98036 <br />RE: 1'oundatioit Placeiireirt Regttii'eitieirty <br />NC Corner 35`" St. and Nassau St., Everett, Mr. <br />City of Everett Project #REVI 04-017 <br />Dear Mr. Spence; <br />An engineering geologist from GES, Inc. has visited the above referenced site on several different <br />occasions to view site excavation progress for foundation placement. Excavation for the foundation of the <br />main residence was completed on Feb.24, 2005 and was confirmed during our visit on uaat date. An <br />approximate 25 ft. cut had been made along the south side of the main residence foundation, abutine the <br />garage area. Due to the presence of significant amounts of uncontrolled till, the southern cut face was <br />laid back to approximately a IH:1V slope for stability purposes. Stockpiled soil are laid out around the <br />entire perimeter of the lot. The excavation for the foundation of the main residence, due to the basement <br />and the amount of uncontrolled fill, was significantly deeper than that required for the garage. It is not <br />possible to safely excavate for the garage foundation at the same time as the main residence due to the site <br />and building constraints listed above. In order to safely prepare the garage area for its foundation. the <br />main residence foundation, basement walls, main level floorjoist, and the foundation backfill will need to <br />be in place. The preparation of the site for the placement of the garage foundation will proceed under the <br />direction of GES, Inc. once the items listed above have been completed. <br />We trust that this letter will meet your current needs. As always, if you have any questions concerning <br />the contents of this letter or its intent, feet free to contact us at your convenience. <br />Respectfully Submitted; <br />Geotechnical amrl Environmental Services, Ine. <br />Kirk R. Bailey, LG <br />Principal Engineeri <br />
The URL can be used to link to this page
Your browser does not support the video tag.