Laserfiche WebLink
CLOS <br />Total UtilityEMainntenancee Management System <br />------------------------- 03/25/1996 <br />Page <br />-1-- <br />Date Range :O1/09/1989 - 03/20/1996 <br />CM Work Order Range :1001091070001 - UT1002- Item Range :<Blank> - WW22020001 Pattern :7'01236730088 <br />Program ALL Function ALL Activity ALL Pattern :* <br />CM WORK ORDER ID: 7101236730088 Title: REPAIR 1020 NORTH PARK DR <br /><<DUPLICATE PRINTING OF THIS WORK ORDER>> <br />Item ID: <br />Location ID: <br />Program 710 Function 123 <br />Date Completed: 03/04/1996 Activity 673 <br />Overall Craft: <br />Issued: 02/15/1996 Issued b <br />Out of Service? NO Priority:y' TraHDAvel <br />Assigned to: <br />Meter Reading: Travel Time: 0.00 Hr. <br />Downtime: 0 hours <br />Status: HL <br />Labor: <br />Craft ID Name <br />----- - Planned Hrs Actual Hrs Cost <br />---------- __ <br />HEO AAL----------- ____ <br />ARNOLD, ARTHUR L-------- <br />SUP1 AGA AHLES, GREGORY A. 0.00 26.00 493.48 <br />UL CJE CASE, JAMES E. 0.00 6.00 128.04 <br />UL GCR GRENZNER, CHRIS R. 0.00 2.00 29.42 <br />HEO LMA LIBBING, MAURICE A. 0.00 8.00 112.16 <br />EO MJL2 MITCHELL, JEFFREY L. 0.00 6820 <br />.00 125.88 <br />UL NCR NIETHAMER, CHARLES R. 0.00 2.00 364.52 <br />64.52 <br />HEO OBJ O'LEARY, BRIAN J. <br />0.00 26.00 64. <br />SUP1 WLK WARNER, LARRY K. 0.00 2.00 30.90 <br />0.00 2.00 45.36 <br />Total Labor Cost: 1806.96 <br />Materials: <br />ID Description <br />------------ ;f <br />----------------------------- <br />Date Used Cost <br />BRIC00061156 BRICK CONCRETE 2" X 4" X 8" <br />------------------ <br />CEME00061438 CEMENT 20 MIN. SET 50 LB. BAG 03/01/1996 45 519 <br />5.6.5 <br />CONC00061338 CONCRETE MIX 60 LB. BAG 03/01/1936 4.28 <br />28 <br />COUP42301247 COUPLING 4" X 4" Cl/PL 03/01/1996 2 . <br />COUP48301547 COUPLING 10" CONC X 10" Cl/PL 03/01/1996 2 4518 <br />.96 <br />N/A CONC INLT/MISC (ASSOC) 02/29/1996 1 1. <br />N/A CONC INLT/MISC. (ASSOC) 02/29/1996 1 516.30 <br />N/A GRAVEL (FROM STOCK) 03/01/1996 338.63 <br />N/A C.D.F. (ASSOC) 03/06/1996 1 78.63 <br />PIPE42304147 PIPE 4" PVC SEWER 329.64 <br />PIPE48304447 PIPE 10" PVC SEWER 03/01/1996 4- .76 <br />03/01/1996 5 22.00 <br />Total Material Cost: 1387.26 <br />