Laserfiche WebLink
August 31, 2006 <br />� <br />Mr. Tim Tomulty <br />I354 Country Club Drive <br />Camano Island, WA 98282 <br />/ PUBL/C SERVICES DEPARTMENT <br />Subject: Project: Gorbunon <br />Jon Address: 118 W. McGill Avenue <br />Plan Check No: C0608-003 <br />Dear Mr. Tomulty: <br />In response to your application for a construction perniit, your plans have been examined and <br />you are advised that the issuance of a permit is being witl�held for the reasons listed below. <br />Thesc comments address building issues only. Additional revisions or additions may be <br />required by other depanments (such as Utililies, Planning or Pire). All references refer to the <br />2003 International Residential Codc, as amended by the 3tate of Washington and/or <br />Washington State Gnergy Code 2004 Fdition, and adopted by the City of Everett, unless stated <br />otherwisc. <br />In order for the processing of your application to continue, it will be <br />necessary to pick up tlie plans from our oiCce and have the engineer make <br />all changes on thc plans. <br />Tl�e plans as drawn do not mcet thc prescriptive requiremcnts for lateral bracing. <br />Provide lateral analysis prepared by a licensed Washington State Structural Engineer. <br />Provide 2 sets of conslruction drawings that are wct stamped aad counter signecl. <br />Please prepare a response Ictter showing where each item in this correction Ietter is addressed <br />on the plan sct. <br />Upon resubmiUal of thc drawings, your application will be given priority and plan revicw will <br />recommence. <br />All required submitlals shall be of sufficient detail and contair, sufficient information to ensure <br />that the proposeJ strucwre will he constn�cted in compliance with all adopted cocies. <br />Sincercly, <br />r� <br />Jeff Hcilman <br />Developmcnt Tcchnician <br />CIN OF EVERETi • 3200 Cedar Street • Everett, WA 98201 •(425) 257-B800 • Fax (425) 257-8856 <br />I�ISDI'PINfAEIiTIL'IIPILMANtbMP{p7111A N' MCGII.I. A\'U <br />