My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
30 W MCGILL AVE 2018-01-02 MF Import
>
Address Records
>
W MCGILL AVE
>
30
>
30 W MCGILL AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2022 3:34:08 PM
Creation date
2/26/2017 2:21:35 AM
Metadata
Fields
Template:
Address Document
Street Name
W MCGILL AVE
Street Number
30
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iJ <br />For SI: 1 foot .= 304.8 mm, ci .= continuous insulation, int .= intermediate framing. <br />' R-values are minimums. U-factors and SHGC are maximums. When insulation is installed in a cavity which is <br />less than the label or design thickness of the insulation, the compressed R-value of the insulation from <br />Appendix Table A101.4 shall not be less than the R-value specified in the table. <br />The fenestration U-factor column excludes skylights. The SHGC column applies to all glazed fenestration. <br />(Exception: Skylights may be excluded from glazed fenestration SHGC requirements in Climate Zones 1 <br />3 where the SHGC for such skylights does not exceed 0.30. <br />`"10/15/21.+TB" means R-10 continuous insulation on the exterior of the wall, or R-15 on the continuous <br />insulation on the interior of the wall, or R-21 cavity insulation plus a thermal break between the slab and the <br />basement wall at the interior of the basement wall. "10/15/21.+TB" shall be permitted to be met with R-13 <br />cavity insulation on the interior of the basement wall plus R-5 continuous insulation on the interior or <br />exterior of the wall. "10/13" means R-10 continuous insulation on the interior or exterior of the home or R- <br />13 cavity insulation at the interior of the basement wall. "TB" means thermal break between floor slab and <br />basement wall. <br />R-10 continuous insulation is required under heated slab on grade Floors. See R402.2.9.1. <br />`There are no SHGC requirements in the Marine Zone. <br />r Basement wall insulation is not required in warm -humid locations as defined by Figure R301.1 and Table <br />" Reserved. <br />" First value is cavity insulation, second is continuous insulation or insulated siding, so "13.+5" means R-13 <br />cavity insulation plus R-S continuous insulation or insulated siding. If structural sheathing covers 40 percent <br />or less of the exterior, continuous insulation R-value shall be permitted to be reduced by no more than R-3 in <br />the locations where structural sheathing is used to maintain a consistent total sheathing thickness. <br />The second R-value applies when more than half the insulation is on the interior of the mass wall. <br />For single rafter- or joist -vaulted ceilings, the insulation may be reduced to R-38. <br />Int. (intermediate framing) denotes standard framing 16 inches on center with headers insulated with a <br />minimum of R-10 insulation. <br />Log and solid timber walls with a minimum average thickness of 3.5 inches are exempt from this insulation <br />Nonfenestration U-factors shall be obtained from measurement, calculation or an approved source or as <br />specified in Section R402.1.3. <br />
The URL can be used to link to this page
Your browser does not support the video tag.