Laserfiche WebLink
PUBLIC WORKS PERMIT Date: 6/17/2008 <br /> , c Public Works Permit#: PW0806-019 <br /> City of Everett Public Works Department <br /> 3200 Cedar Street Building Permit#; <br /> Everett, WA 98201 Planning Reference#: <br /> (425) 257-8810 <br /> Public Works Fee $: $ 25.00 <br /> Other$: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> BUNNEY MELISSA A CARPER JOEL <br /> 1030 W MUKILTEO BLVD (SPOUSE) <br /> EVERETT WA 98203 <br /> PHONE: PHONE: 4257370652 <br /> TAX PARCEL ID# 00505800001901 SITE ADDRESS: 1030 W MUKILTEO BLVD <br /> DESCRIPTION OF PROPOSED WORK: <br /> FILL DITCH IN RIGHT OF WAY <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> 4. Existing pipe and ditch are shallow so that pipe will have minimal cover. Must maintain minimum of 12" of cover <br /> over the pipe. <br /> 5. Call for meeting with inspector(Randy Allen, 425-339-7403)when starting work PR 3:;1-14 <br /> 6. Provide any traffic control a needed. Consult with the Public Works Inspector (Randy) <br /> 0.0 <br /> L� <br /> 48. <br /> O <br /> L. <br /> ® 4 <br /> 0 Fi <br /> ca.EZ <br /> . /i <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and <br /> save harmless the City of Everett from any and all claims for <br /> damages, costs, expenses, or causes of action that may arise <br /> //'� /� because of installation and maintenance of the improvement <br /> 6 o�7 0 or other right-of-way use hereto applied for and further agrees <br /> A roved for Construction Dat to remove same upon notice from the City and to replace <br /> p public property damaged thereby. <br /> FINAL INSPECTION Date <br /> Approved as Constructed ignature of A p cant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />