Laserfiche WebLink
_.� <br />ctons ( con't ) <br />r� _E`� t�A�TT. �' ____.._._ - `- �=..�.:... <br />�/�yvt 1 Continued � <br />� thence South 34* 53' 19" West for 85.0 feet to the Southerly line of said Lot 4; thence <br />r w <br />N 55' 06' 46" West along sald Southerly line to the Easterly boundary of Mukilteo <br />r�—j <br />Boulevard; thence Norti easterly along said Easterly bounrlary of Mukllteo Boulevard to <br />the Northaly li�e of satd Lot 4; thence S SS* 06' 46" E along said Northerly line of � <br />safd Lot 4 to the true point of beginning; ' <br />�EXCEPT that portion in the Southwesterly corner of said Lot 4 conveyed to the State of <br />Washin9ton for Secnndary State Hiahwav No. 1-I bv deed under Auditor's File No. 111676;� <br />SUBiECT 'PC an easement for innress, ,enress and urilities over, under and across that ' <br />oortion of Let 4: Plat of Maple Heights, according to the plat thereof recottied tn Volume <br />_ 10 of Plats� oaae 23, re�ords of Snohomish County, Washington, described as follows;, <br />_Commencing at the most Northea�erly corner of satd Lot 4; thence N 55* O6' 96" W alo' <br />_the Northaly line of said Lot 4 for .80.80 feet to the true �flint of beginning; thence <br />S 34* 53�4" W for 20.0 feet; thence N 55* 06' 46" W parallel to the Northerlv line of <br />_ said Lot 4 to the Easterlv b�undary of Mukilteo Boulevard; thence Northeasterly along <br />_sa�l_ Easterlv bou�darv of Mukilteo Boulevarcl to the Northerlv line of said I,ot 4: thenc <br />S SS� O6' 46" E along said Northerly line to the true point of beqinning; <br />SUBjECT 'IC an easement to the Cit� of Everett for sewers over, under and across the <br />u• ����' 1 ' • � • • •-� �� • • 1• 1 <br />� <br />