My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1318 W MUKILTEO BLVD 2016-01-01 MF Import
>
Address Records
>
W MUKILTEO BLVD
>
1318
>
1318 W MUKILTEO BLVD 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2017 1:06:31 AM
Creation date
2/26/2017 2:52:06 AM
Metadata
Fields
Template:
Address Document
Street Name
W MUKILTEO BLVD
Street Number
1318
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wrought Corporation <br />August 11, 2006 <br />JN 06287 <br />Page 8 <br />fluid with a unit weight of 30 or 40 pounds per cubic foot (pc� depending on whether <br />the shoring is temporary or permanent. <br />Traffic surcharges can typically be accounted for by increasing the effective height of <br />the shoring wall by 2 feet. Slopes above the shoring walls will exert additional <br />surcharge pressures. These surcharge pressures will vary, depending on the <br />configuration of the cut slope and shoring wall. Wa can provide recommendations <br />regarding slope surcharge pressures when the preliminary shoring design is <br />completed. <br />It is important that the shoiing design provides sufficient working room to drill and <br />install the soldier piles, without needing to make unsafe, excessively steep <br />temporary cuts. Cut slopes should be planned to intersect the backside of the drilled <br />holes, not the back of the lagging. <br />Lateral movement of the soldier piles below the excavation level will be resisted by <br />an ultimate passive soil pressure equal to that pressure exerted by a fluid with a <br />density of 450 pcf. No safety factor is included in the given value. A typical safety <br />factor of 1.2 or 1.5 should be included in this value to obtain an allowable pressure <br />depending on whether the shoring is temporary or permanent. This soil pressure is <br />valid only for a level excavation in front of the soldier pile; it acts on two times the <br />grouted pile diameter. Cut slopes made in front of shoring walls significantly <br />decrease the passive resistance. This includes temporary cuts necessary to install <br />internal braces or rakers. The minimum embedment below the floor of the <br />excavation for cantilever soldier piles should be equal to the height of the "stick-up." <br />The vertical capacity of soidier piles to carry the downward component of the tieback <br />forces will be developed by a combination of frictional shaft resistance along the <br />embedded length and pile end-bearing. <br />Where: (i) psf is pounds per square foot <br />The above values assume that the excavation is level in front of the soldier pile and <br />that the bottom of the pile is embedded a minimum of 10 feet below the floor of the <br />excavation. For the pile end-bearing to be appropriate, the bottom of the drilled <br />holes must be cleaned of loosened soil. The shoring contractor should be made <br />aware of this, as it may affect their installation procedures. The concrete surrounding <br />the embedded portion of the pile must have su�cient bond and strength to transfer <br />the veRical load from the steel section through the concrete into the soil. <br />GEOTECH CONSULTANTS. INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.