My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1404 W MUKILTEO BLVD 2016-01-01 MF Import
>
Address Records
>
W MUKILTEO BLVD
>
1404
>
1404 W MUKILTEO BLVD 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2017 6:02:10 PM
Creation date
2/26/2017 2:57:58 AM
Metadata
Fields
Template:
Address Document
Street Name
W MUKILTEO BLVD
Street Number
1404
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT COMMENTS <br />4. As par Public Works approved plan dated __ <br />5. Connect side sewer per City Siandard #601. <br />i 6�Connect side sewer per City Stzndard #'s 601, 602, 604. <br />� <br />7. Conneci all rooftop downspouts to tlie side sewer. <br />8. Connect rooftop downspout� to the drainage system provided for this lot. <br />�" 9.,�Rooftop runoff must be discharged to a re�f downspout infiltration system ptr City of Everett <br />-' - Storm Manual 3-2.6.2. Width 3, Depth =�� S,�Length . 2Q� <br />10. The contractor must meet with the Publir, Works Inspector to discuss potential drainage <br />routing prior to beginning the project. <br />' 11�Install erosion control measures as determined by the Public Works inspector, such as siit <br />���fence, straw bales, swales, or erosion blankets. <br />12. Install erosion control measures per Ciry of Everett Standards for small parcels <br />13 Remove erosion control measures upon completion ci the project prior to final approval of the <br />' . permit. <br />,( 14. II excavrited material from fo��.idation, sidewalk and driveways shall be hau!ed to an <br />� appioved, permitted site. No wasting of material is allowed on this building lot. <br />� 5. Remove and replace curb, gutter and sidewalk as per Ciry of Everett Standard Plan �'s 305A <br />& 306 on this proposal's frontage as directed by the Pubiic Works Inspector (i.e. all unused <br />driveways and any broken or damaged area must he replaced). <br />16. Install a Type I concrete driveway per City of Everett Standard �307. <br />17. Pa�e driveway from the front property line out to the sireet paving. <br />18. Contact the Water District for connecting provisions for this building's <br />water and sewer services. <br />19. A catch basin as per City 5tandard Plan ;402 with a gas trap per Standard Plan ;410 is <br />required for the parking area. <br />20. If a sewer pump system �s to be installed, the pressure line must discharge into a private <br />manhole, then gravity flow across the public right-of-way. <br />21. A sprinkler system is required for this building in compliance with the requirements of NFDA <br />Standards 13D. <br />=C;Ccmmen;s ��/� <br />�Z <br />
The URL can be used to link to this page
Your browser does not support the video tag.