Laserfiche WebLink
� <br />CLOSED CM WORK ORDERS REPORT <br />Total Utility Maintenance Management System pa e 1 <br />06/02/1995_____________________________g===== <br />Date Range :O1/09/1989 - 05/31/1995 <br />CM Work Order Range•:1001091070001 - 8801086100085Pattern :7401196751269 <br />Item Range :<Blank> - WW22020001 Pattern :* <br />Program ALL Function ALL Activity_ALL_____________________________________ <br />CM WORK ORDER ID: 7401196751269 Title: CONVERT 1408 WEST MUKILTEO BLVD <br />« DUPLICATE PRINTING OF THIS WORK ORDER» <br />Item ID: WS3694M036 -- hATER SERVICE <br />Location ID: -- Activit 675 <br />Program 740 Function 119 y <br />Date Completed: 05/23/1395 <br />Overall Craft: <br />Issued: 05/04/1995 <br />out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID <br />UL MWE <br />WST NSO <br />UL SSJ <br />WST WDT <br />Materials: <br />ID <br />ADAP34000547 <br />BOX000056247 <br />COUP34142747 <br />ELL034101447 <br />METE36089447 <br />PIPE34060647 <br />VALV34008348 <br />VALV34097448 <br />Issued by: JSM Assigned to: <br />Priority: Travel Time: 0.00 Hr. <br />Name <br />MOORE, WARREN E. <br />NIELSEN, Sc;OTT O. <br />SMITH, STEVE J. <br />WALDEN, DAROLD T. <br />Planned Hrs <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Description <br />ADAPTER 3/4" MIP X INSTA-TITE@ <br />BOX METER PLA 15" X 10" W/LID <br />COUPLING 3/4" CTS COMP X MIPT@ <br />ELL 3/4" 90 DEG BRASS <br />METER 5/8" X 3/4'° NEPTUNE T-10 <br />PIPE 3/4" POLY I.P.S. <br />VALVE METER 3/4" LOCK WING IP@ <br />VALVE ANGLE CHECK 3/4" @ <br />Actual Hrs <br />14.00 <br />14.00 <br />8.00 <br />9.00 <br />Total Labor Cost: <br />Date <br />05/23/1995 <br />05/23/1995 <br />05/23/1995 <br />05/23/1995 <br />05/23/1595 <br />05/23/1995 <br />05/23/1995 <br />05/23/1?95 <br /># Used <br />4 <br />1 <br />2 <br />2 <br />1 <br />4 <br />1 <br />1 <br />Total Material Cost: <br />Vehicles: Hours Cost <br />ip Description <br />------ -------------------------- <br />---- ------ ------ <br />V2117 91 CHEV 1-TON HYD UNIT 9.00 50.40 <br />V2139 86 CHEV 1-TON W/HYD. UNIT 11.00 _____55_00 <br />Total Vehicle Cost: 105.40 <br />Cost <br />210.42 <br />231.84 <br />120.24 <br />180.72 <br />----'7 4 3 . 2 2 <br />Cost <br />31.88 <br />12.94 <br />10.72 <br />2.58 <br />27.90 <br />1.00 <br />8.36 <br />11.86 <br />107.24 <br />Work Description: --------------------- <br />--------------------------------------------- <br />