Laserfiche WebLink
. � <br />CIASED CM WORK ORDERS REPORT <br />Total Utility Maintenance Management System <br />02/28/1995 Page 1 <br />Date Range :O1/09/1989 - 02/21/1995 <br />CM Work Order Range :1001091070001 - 8801086100085Pattern :7401196751110 <br />item Ranqe :<Blank> - WW22020001 Pattern :* <br />Program ALL Function ALL Activity ALL <br />------------------------------------------------------------------------------�-- <br />CM WORK ORDER ID: 7401196751110 Title: CONVERT 1422 KILTEO BLVD <br />«DUPLICATE PRINTING OF THIS WORK ORDER» �� <br />Item ID: WS3694M034 -- WATER SERVICE <br />Location ID: -- <br />Program 740 Function 119 Activity 675 <br />Date Completed: 02/17/1995 <br />Overall Craft: <br />Issued: 02/15/1995 <br />out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />Ste'cus : <br />Labor: <br />Craft ID <br />UL MWE <br />UL NSO <br />Materials: <br />ID <br />Name <br />Issued by: SKL Assigned to: <br />Priority: Travel Time: 0.00 Hr. <br />- ----------------- <br />MOORE, WARREN E. <br />NIEISEN, SCOTT O. <br />METE36089447 <br />Vehicles: <br />ID <br />V2139 <br />Description <br />------------------------------ <br />METER 5/8" X 3/4" NEPTUNE T-10 <br />Description <br />86 CHEV 1-TON W/HYD. UNIT <br />Work Description: <br />------------------------------------------- <br />METER# 39594130 <br />CONCRETE BOX IN SIDEWALK <br />Planned Hrs <br />0.00 <br />0.00 <br />Actual Hrs Cost <br />---------- ---------- <br />3.00 44.49 <br />3.00 49.68 <br />Total Labor Cost: 94.17 <br />Date # Used Cost <br />-------- -------- ---------- <br />02/17/1995 1 26.14 <br />Total Materi.al Cost: 26.14 <br />Date Hours <br />02/17/1995 3.00 <br />Total Vehicle Cost: <br />Cost <br />15.00 <br />15.00 <br />Total cost for work order 7401196751110: 135.31 <br />• <br />