Laserfiche WebLink
everett INSPECTION REPORT --1� Address6f-b�-`=mi �l <br />e1 <br />Contractor <br />Owner lA) i <br />Date 0 <br />TYPE OF INSPECTION REQUESTED / <br />C, BLDG: Pmt. No. _ X MECH: Pmt. No. -- <br />ELEC: Pmt. No. --El PLBG: Pmt. No. <br />❑ Temp. Elect. ❑ Framing ❑ Gas Piping <br />❑ Footing ❑ Drywall, Nailing ❑ Consultation <br />❑ Foundation ❑ Shear Nailing ❑ Groundwork <br />O Ductwork ❑ Grid ❑ Struct. Slab <br />❑ Woad Stove ❑ Rough -In J8(Final <br />❑ Masonry ❑ Service — <br />APP OVAL El PARTIAL APPROVAL <br />❑ CORRECTION REQUIRED <br />❑ Corrections listed below MUST BE MADE before work can be approved. <br />❑ Please contact inspector and arrange for appointment. <br />❑ was not able to perform inspection. <br />❑ CALL 259.8810 FOR REINSPECT,ON — 24 hour notice required. <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREMISES PRIOR TO OCCUPANCY. <br />Date <br />Inspector <br />