Laserfiche WebLink
INSPECTION REPORT <br />Address �� Z � r'` � � <br />Contractor �� �� p �� <br />Owner ���� ���`-� — <br />Date -- �! L � <br />PPROVAL ❑ PARTIAL APPROVAL <br />C] VIOLATION ❑ CORRECTION REQUESTED <br />O Corrections listed below MUST BE MADE before work can be approved. <br />O Pieese conlact inspector and errange (or appointment. <br />U Was not able to pertorm inspection. <br />❑ CALL (425) 257-8810 FOR REINSPECTION — 24 hour notice required <br />A CERTIFICATE OF OCCUPANCY SHALL RE ISSUED AND POSTED <br />ON THE PREMISES PRIOR TO OCCUPANCY. <br />�t� <br />TYPE OF INSPECTION REDUESTE� <br />i� Temp. Eled. 0 Framing as Piyinr <br />U Footin ❑ Drywal(, Nailing 'J Consultation <br />❑ Foundation 0 Shear Nailing U Groundwork <br />❑ Ductwork l7 Grid ❑ Sirud. S�ab <br />❑ Wood Srove ❑ Rough-in :] Final <br />❑ Masonry ❑ Service O Insulation <br />❑ Other ���/� <br />U BLDG: Pmt. No. ECH: PmL No.L.L'/st�3�.— <br />O ELEC: Pmt. No. ❑ PLBG: Pmt. No. <br />