Laserfiche WebLink
March 10,2003 <br />Everett Public Works <br />3200 Cedar Street <br />Everett, WA. 98201 <br />RE: EXPIRING PERMITS <br />Everett Public Works Itr. dtd. March 7, 2003 <br />Job Address: <br />Permits: <br />1907 Mukilteo Blvd. <br />60205-018 (Convcrt carport to garage) <br />E0209-080 (Electrical for garage) <br />I am writing regarding the 180 day clause of suspended or abandoned work on the <br />above listed project. Before the receipt of your letter I was not aware of this clause in <br />the UBC. Thank you for making me aware of this provision. <br />Last fall, by the time the perimeter fo�ting was installed the weather turned too cold for <br />the stain to dry on the new siding even though I attempted it on a few boards during <br />some of the sunny days. The stain manufacturer recommends the temperature be at <br />least 50 degrees or above to dry. The new cedar siding is in the garage waiting for the <br />weather to cooperate. I plan to apply the stain before I install it on the garage to get a <br />good complete application. I plan on doing the above work myself. <br />Henry's Electric has completed the wiring on the house panel & it is ready for <br />inspection. The two lights on the front of the garage can be installed prior to the siding <br />installation. As �oted on the inspection report, when they are installed I can call for a <br />final etectrical inspection. <br />Per your letter at this time I request a 180 day extension on the psrmits to complete the <br />electrical work and also to give me time to complete the siding as planned. <br />Thank you for your consideration in this matter. <br />Sincerely, _, <br />( —� > <br />James V. Pearson <br />(Homeowner) <br />(i <br />