Pagel of 2 <br />Kirk Brooks <br />To: dennist@cgengineering.com <br />Cc: Randy Allen; Steve Miller <br />Subject: RE: pw0612-003 <br />Dennis, <br />The changes to the drawings have been reviewed and okayed by our structural engineer. Could you provide us with 2 full <br />size copies. Please continue with the work as planned. <br />Kirk <br />From: Dennis Titus [mailto:dennist@cgengineering.com] <br />Sent: Thursday, January 11, 2007 3:49 PM <br />To: Kirk Brooks <br />Subject: pw0612-003 <br />Kirk, <br />Construction is about to begin on this project. In case you don't remember it, it is a slope stabilization retaining wall on the Mukilteo <br />DLD. After the recent rains the slope is showing more signs of movement in areas that we weren't planning on shoring up. The <br />Owner and the contractor would like to extend the shoring wall farther than was approved on the permit drawings. It is getting close <br />to the point now where it is going to be an emergency if construction isn't started in the next couple of weeks. <br />i will have revised plans completed Monday. I assume you will need to see these since we are extending the wall. 1 will include a <br />preliminary plan and proposed plan so you can see the changes. Our Gcotech is out of town until the end of January so I won't be able <br />to get another letter of review from him until then. 'these changes were all discussed with him on site before he left. All of the testing <br />and monitoring criteria will remain the sane. Will we need another review letter from him for a revised submittal? Nelson <br />Geotechnical will be perfonning on site observations during pile driving as well as anchor load tests and will be involved during the <br />construction process. <br />What will be the turn around time on this? The contractor would like to start staging equipment next late week and start construction <br />the following week. Is this feasible? I'm afraid we are running out of time to get this hill side shored up. I would have gotten this to <br />you sooner but it just came to in, yesterday. <br />Thank you for your time. Let me know if you have any questions or continents. I have a site inspection in Spokane tomorrow <br />(Friday) and will be gone most of the day but will be in the office all day Monday. <br />Dennis Titus <br />CG Engineering <br />250 4th Avenue South, Suite 200 <br />Edmonds, WA 98020 <br />P (425) 778-8500 <br />F (425) 778-5536 <br />l <br />1 /16/2007 <br />