My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1915 W MUKILTEO BLVD 2018-01-02 MF Import
>
Address Records
>
W MUKILTEO BLVD
>
1915
>
1915 W MUKILTEO BLVD 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2022 7:55:15 AM
Creation date
2/26/2017 3:27:02 AM
Metadata
Fields
Template:
Address Document
Street Name
W MUKILTEO BLVD
Street Number
1915
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Engineering Evaluation and Slide Repairs <br />1915 Mukilteo Boulevard <br />July 26, 2006 <br />NGA File No. 743206 <br />Summary - Page 2 <br />methods. Based on this understanding, we have recommended the use of a light retaining wall to be <br />placed along the top of the slope within the areas that show the most damage (namely the portion of the <br />slope along the northern side of the residence), along with erosion controi and drainage systems to be <br />utilized below the retaining wall. Within the areas of the slope that have not been severely impacted by <br />the slide, but are still at significant risk of future movement (northeast and east of the residence), we <br />recommend a combination of drainage improvements and erosion control measures to reduce the potential <br />for future sliding, along with a monitoring program to assess the future performance of these areas for <br />potential repairs as needed. <br />The recommendations provided in this report for repairing the site slopes are preliminary and general in <br />nature. We expect that we would need to work closely with your designer and contractor to come up with <br />a practical design for the needed stabilization measures and to also ensure that these measures are <br />implemented correctly in the field. <br />It has been a pleasure to provide service to you on this project. Please contact us if you have any <br />questions regarding this report or require further information. <br />Sincerely, <br />SOCIATES, INC. <br />Two Copies Submitted <br />cc: Greg Guillen — CG Engineering (One Copy) <br />
The URL can be used to link to this page
Your browser does not support the video tag.