Geotechnical Engineering Evaluation and Slide Repa rs <br />1915 Mukilteo Boulevard <br />July 26, 2006 <br />NGA File No. 743206 <br />Page 9 <br />We recommend that the pile be a minimum of 4-inch diameter galvanized steel pipe sections driven into <br />place using a hydraulic hammer, with a minimum energy rating of 1,100 ft-lb. The piles should be spaced <br />at a maximum distance of 4 feet, and should be embedded a minimum of 15 feet into the competent slope <br />material. The maximum spacing and minimum embedment values are to provide additional <br />reinforcement to the slope and lessen the potential for sliding. The piles should be battered back toward <br />the core of the slope at an angle of 15 degrees from vertical. In addition to the minimum recommended <br />embedment into the native material, the piles should be driven to a refusal criteria of less than one inch of <br />movement during 15 seconds of continuous driving. <br />The exposed portion of the wall should not exceed ten feet in height. Any backfill placed behind the wall <br />should consist of clean 2-inch crushed rock. The tic -backs should extend a minimum of 20 feet into the <br />slope aad should be battered at an angle of 15 degrees below horizontal. The tiebacks should be a <br />minimum of 4-inches in diameter, but should be sized to provide resistance for an active pressure <br />resulting from a fluid of equivalent density of 40 pounds per cubic foot (pcf), acting along the back of the <br />wall. All active pressure should be picked up by the tie -backs and no passive resistance on the embedded <br />portions of the piles should be utilized. This may entail using two rows (or more) of tie backs for this <br />wall. The tie -backs should be tested after installation to ensure adequate performance. We can discuss <br />tic -back test procedure with the contractor at the time of construction. The attached Figure 10 is a <br />schematic detail showing the recommended wall. <br />Slope Improvements and Drainage <br />After the wall has been installed, the portion of the slope below the wall should be investigated and slope <br />improvements performed to lessen the potential for future erosion and sliding below the wall. These <br />conditions, Knot addressed, could eventually undennine the wall. <br />These. improvements should include removing the vegetative cover and slide debris in certain locations, <br />benching the slope, placing a layer of rock spalls to buttress the slope, and installing shallow drains to <br />control surface and subsurface water flow. The actual extent of such improvements should be determined <br />in the field at the time of construction. However, in general, areas of sloughing and slide debris would be <br />over -excavated down to competent material and 4-foot wide benches created in these areas. A minimum <br />1-foot thick layer of 4- to 8-inch rock spalls would then be placed on the exposed surface. Shallow cut- <br />off drains would be installed at strategic locations to divert water seepage away from sensitive areas. The <br />NELSON GEOTECHNICAL ASSOCIATES, INC. <br />I <br />