My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1915 W MUKILTEO BLVD 2018-01-02 MF Import
>
Address Records
>
W MUKILTEO BLVD
>
1915
>
1915 W MUKILTEO BLVD 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2022 7:55:15 AM
Creation date
2/26/2017 3:27:02 AM
Metadata
Fields
Template:
Address Document
Street Name
W MUKILTEO BLVD
Street Number
1915
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Engineering Evaluation and Slide Repairs <br />1915 Mukilteo Boulevard <br />July 26, 2006 <br />NGA File No. 743206 <br />Page 11 <br />We recommend that NGA be retained to review final plans prior to construction. We also recommend <br />that NGA be retained to provide monitoring and consultation services during construction to confirm that <br />the conditions encountered are consistent with those indicated by the explorations, to provide <br />recommendations for design changes should the conditions rep: ^aled aunng the work differ from those <br />anticipated, and to evaluate whether or not earthwork activities comply with contract plans and <br />specifications. We should be contacted a minimum of one week prior to construction activities and could <br />attend pre -construction meetings, if requested. <br />All people who own or occupy homes on hillsides should realize that landslide movements are always a <br />possibility. The landowi,er should periodically inspect the slope, especially after a winter storm. U <br />distress is evident, a geotechnical engineer should be contacted for advice on remedial/preventative <br />measures. The probability that landsliding will occur is substantially reduced by the proper maintenance <br />of drainage control measures at the site (the runoff from the roofs should be led to an approved discharge <br />point). Therefore, the homeowner should take responsibility for performing such maintenance. <br />Consequently, we recommend that a copy of our report be provided to any future homeowners of the <br />property if the home is sold. <br />Within the limitations of scope, schedule, and budget, our services have been performed in accordance <br />with generally accepted geotechnical engineering practices in effect in this area at the time this report was <br />prepared. No other warranty, expressed or implied, is made. Our observations, findings, and opinions are <br />a means to identify and reduce the inherent risks to the owner. <br />.•. <br />NELSON GEOTECHNICAL ASSOCIATES, INC. <br />�'�dJ <br />
The URL can be used to link to this page
Your browser does not support the video tag.