Laserfiche WebLink
Preliminary Geotechnical Engineering Evaluation <br />I 1919 Mukilteo Boulevard <br />October 20, 2005 <br />NGA File No. 718805 <br />Page 15 <br />We recommend that NGA be retained to provide monitoring and consultation services during <br />construction to confirm that the conditions encountered are consistent with those indicated by the <br />explorations, to provide recommendations for design changes should the conditions revealed during the <br />work differ from those anticipated, and to evaluate whether or not earthwork and foundation installation <br />activities comply with contract plans and specific itions. We should be contacted a minimum of one week <br />prior to construction activities and could attend pre -construction meetings if requested. <br />Within the limitations of scope, schedule, and budget, our services have been performed in accordance <br />with generally accepted geotechnical engineering practices in effect in this area at the time this report was <br />prepared. No other warranty, expressed or implied, is made. Our observations, findings, and opinions are <br />a means to identify and reduce the inherent 1. i ,Q iiie owner. <br />.•. <br />NELSON GEOTECHNICAL ASSOCIATES, INC. <br />