Laserfiche WebLink
��;,�::r .. <br />� .� <br />��- <br />; :,;:' .. <br />��r i ,. <br />��+,�`_„ ;.. <br />V=i r'?�: <br />�; ,.: <br />;�; .����.;�i. <br />�:•. <br />'�; 1-� : <br />�y:. , <br />, o✓`'�C`—' <br />�COST SHEET <br />�����v�� <br /><<i�+'� -1 19�7 <br />CITY OF EVERETT <br />Public Works Dept. <br />Receipt � _�dSl�'y�--- 3,036.00 <br />}( Cost of Work Order �— <br />Cost of Service Order �� <br />Contact Person TrFsh McCabe <br />Requested By Kirk B� S <br />Property Owner (name) Same <br />PuUlic Works Departr�ent <br />?Jtilities Division <br />3200 Cedar Street <br />Everett, W�sh�oBton 98201 <br />(206) 259-8800 <br />Date Paid <br />Work Order � <br />Service Order # <br />Telephone # <br />Date of Request <br />7�a� 5� <br />353-9358 <br />4-25-97 <br />Charge Cost to (name if different than owner) Z�P 98203 <br />Address 2001 �tukilteo Blvd <br />C��y Everett <br />Installation Location So. side of Muk. Blvd from 2001 <br />Installation type/description/size/etc. Expose 8" main, tap, install hydrant & staR Z poR, restore area. <br />►� <br />� <br />The following estimate is based upon the Utilities Division providing all labor, equipment, materials, <br />restoration, and final hook-up. <br />The following estimate is based upon the Street Division work group providing all labor, equipment, <br />materials and restoration to property. _ __� ;^c.n„�f;, <br />Please nonrv �uo �.•- �• -- - <br />allow for schedulin and arts rocurement <br />Cor which such installation was made and the owner <br />Whenever the estimated cost is not suf�cient to cover the total e�cpense for labor, material, equipment renta an <br />administr�tive costs, the deficit shall be charged to the prope y <br />� �� {or the installation. <br />thereof, and provided further, that any excess payment shall be returned to the person app y� B <br />Itemized Cast Estimate: <br />Labor 3c Benefits <br />Material <br />Equipment Rental <br />Surface Restoration <br />Sales Tax <br />TOTaI. <br />Prepared by: <br />Accepted by: <br />�f,'-�/U� <br />COSTdGvp fiCOlia�LL?�Si1.9b <br />864.i10 <br />1456.00 <br />494.00 <br />222.00 <br />53,036.00 <br />Date Est. <br />Prepared: <br />��� 4-30-97 <br />��, g�dg, permit Center <br />Clair Olivers <br />Tom Thetford <br />Kirk Broaks <br />Gordan W�tcher <br />Dan Lowell <br />Stan Mi[chell <br />Paul McKee <br />Gerry Crum <br />Representmg: <br />ESTIMATE GOOD FOR 6 �40NTHS <br />