My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001 W MUKILTEO BLVD 2016-01-01 MF Import
>
Address Records
>
W MUKILTEO BLVD
>
2001
>
2001 W MUKILTEO BLVD 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2017 6:32:34 AM
Creation date
2/26/2017 3:37:31 AM
Metadata
Fields
Template:
Address Document
Street Name
W MUKILTEO BLVD
Street Number
2001
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. <br />� <br />'� Proposed McCabe Residrnce Remodel <br />Everett, Washington <br />Projxt No. 6G-9701022 <br />Page 6 <br />• Replece the existinQ drein line that dischuQd on the slope east of the house with an <br />wdartmged, non-perforated pipe that ia routed to a suitable diecherae location such as a <br />�torm �ewer or t6e bottom of the dope. <br />• Construct �ght line dixherge pipa tbr footing and roof drains, with cleanouts at <br />eppropriau locetions for effective inspcction end maintemnce, which drain by graviry to <br />a suitable discherge location such as tix bottom of slope or a stoim drsin. <br />• Coc�huct a new 6ench d�ain along du top of the slope on the north and aat sides of the <br />site. The drains should extend as far souih and west as siu c�nstrai�s pecnut, and �lwuld <br />extend aa dap � tlx g�ade w the discharge location allows, at la+st ? to 4 fat dap et the <br />shallowat point . The new drsin should be a graviry system, and should not depend on <br />elcetric pumps. A minimum 6-inch diuneter pipe sl�ould be situated in a trtnch at tesst <br />18 inctks wide and filled with pea gravel or washcd mund rock to within 6 inches of the <br />ground surfece. The upper siu inches could be covered with planting soi t md sceded with <br />geass. My cover for the dcaiu should not impede infiltration of surfece water co the d�ain. <br />Waste soil generated from conshvc6on of the French dcain should not be plecxd on or <br />above the slope, but shoutd be recnoved &om the site or at least piaced in m area distmt <br />from site slopes. <br />• Refrain from placing any additional yerd vveste, fill meteriel, consttuction material <br />stockpiles, or other surcherges betwan the house and top of tF�e slope, and considec <br />removiag any accessible existing yard waste or other debris from the tops of the slopes. <br />� Remove the fil( wedge and rockery from below the deck. This fill is in a particulariy poor <br />loca6on, is loose, and provides a good reservoir for perched groundwater. The fill does <br />not appear to serve a useful piupose with the present site configuradon. <br />• Instell some focm of leak conteinment and/or leak detcction for the outdoor spe. <br />�� �.:,: �� :, •���� �.: „ <br />Based upon the subsurface conditions encountercd during exploradon, the following site <br />preparation procedures have been developed end include recommendations rogarding site drainage, <br />stripping, subgrade protection, proofrolling end subgrade compacdon. In order to reduce the potential <br />for movement of slopes on or adjacent to the site as a rcsult of construction activides, slope movement <br />risk reduction measures should be implemrnted first, follow�d by site preparation. Earthwork duting the <br />dry summer months between about May and September, and carefiil management of site dtainege would <br />also provide lower risks of slope movement during construcdon. <br />
The URL can be used to link to this page
Your browser does not support the video tag.