My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001 W MUKILTEO BLVD 2016-01-01 MF Import
>
Address Records
>
W MUKILTEO BLVD
>
2001
>
2001 W MUKILTEO BLVD 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2017 6:32:34 AM
Creation date
2/26/2017 3:37:31 AM
Metadata
Fields
Template:
Address Document
Street Name
W MUKILTEO BLVD
Street Number
2001
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br />LPropoxd McCabe Residence Remodel <br />Everett, Weshington <br />� ProjectNo.6(3-9701022 <br />� Page 11 <br />Coatinuow or column footings caet atop at least mcdium-deaee astive soils encountatid �t s <br />depth of about 4 to 7 fat below e�isting g�ade or stnwtural fill placed ova t6e mediusn dease mtive soil <br />and compected W a minimum of 90 percent of the modiSed Proctor meximum dry deasity may be <br />designed for a ewcimum ellowable beacing pre�ae of 2,500 p�f. A one-t6ird i�rease of t6ae beuinQ <br />pressures may be uxd for s6oK-tenn dynamic loads auch �s wind and seismic forces. <br />In tieu of extending the foundatioos down W the mediwn dense native soil�, the loose, aear- <br />surface soils e�couataed at the anticipated fo�mdation bearing grade could be overcxcavated to a depth <br />of 4 to 7 fcet below exi�ting g�ude and rxon►p�coed. Prm'ided the moisture content petmite. or retnoved <br />end replacxd with pit-nm send and �avel fill. The ova+excavation should also extend laoerally eway from <br />each side of the founda6oa a distence equal to tl�e depth of the overexcavation and beckfillcd with <br />compected structural fill. Controlled density fill {60t psi min.) bacrfill may be uxd in ve[tical <br />excavetions below the a►tire fo�u�da6on width a+ m altemste W help limit lateral overexcavetion rcquired <br />witl► soil beckfill. <br />�� � „ �� ; ,� �,� �� �.,� �� � �. , � <br />The local building code is understood to req�tire n minimum 18 inch foundstion embedment <br />depth; therefore, a minimum embedment depth of 18 inches below the finished exterior gtade is <br />recommended for perimeter footings. Interior footings ahould be placed at leavt 12 ine6e� betow the <br />floor slab within heatcd poRions of the building. All footings must be protecte� egainst weather dert�ege <br />both during and after construc6on, and must be suppotted by suitable bearing tmtecials as eecotnnxnded <br />herein. <br />FafimaMvl Seklement <br />It is estimated that the total settlement of foundadon members founded within the above <br />mentioned soils may approech 1 inch. Differential xttiement of foundadons founded witlun the aeme <br />soil type could approximate one-half of the total settlement If possible, it is recommended thet the <br />foundadon elements be placed within the seme soil type to minimize the magnitude of possible <br />differontial setdement. It should be noted that differential settlement could approech tlx Wtal xtUement <br />values if adjacent footings are founded on different beazing strata <br />Foundation settlement is oftentimes the function of the condit'on of the footing excavation <br />subgrade. Footing excavaGons should be free of loose or soft soil, sloush, debris or water prior W <br />pouring concate. If dishulxd or soR soils are left beneath the foodng area prior to conerote placement, <br />future settlements may be greatly increased. For that reavon, it is rxommended that the footing subgrade <br />soils be observed by a representative of Grles prior to pouring footing concrote to document that the <br />condidon of the bearing soils is consistent with the recommendadons contained in ihis report. <br />
The URL can be used to link to this page
Your browser does not support the video tag.