Laserfiche WebLink
C! <br />� <br />�1 <br />10 <br />'� <br />(11.� <br />12. <br />PUBLIC WOk::S PERMIT COMMENTS <br />As per Public Works approved plan dated <br />Connect side sewer per City Standard #601. <br />Connecl side sewer per City Standard #'s 601, 602, 604. <br />Connect all rooftop downspouts to the side sewer. <br />Connect rooftop downspouts lo lhe drainage system provided for this lot. <br />Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br />Storm Manual 3-2.6.2. The approximate size trench is 3.5' wide, 2' deep and 25' long. See <br />attachment for more details. <br />The contraclor must meet with lhe Public Works Inspector to discuss potential drainage <br />routing prior to beginning the project. <br />Instali erosion control measures as delermined by the Public Works inspector, such as silt <br />fence, straw bales, swales, or erosion blankets. <br />Instail erosion control measures per City of Everett Standards for small parcels <br />13. Remove erosion control measures upon completion of the project prior to final approval of the <br />permit. <br />14. All excavated material from foundation, sidewaik and driveways shall be hauled to an <br />approved, permitted site. No wasling of material is allowed on this building lot. <br />15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br />& 306 on this proposal's frontage as direcled by the Public Works Inspector (i.e. all unused <br />driveways and any broken or damaged area must be replaced). <br />16. <br />17.1 <br />Install a Type I concrete driveway per City of Everett Standard #307. <br />Pave driveway irom the front property line out to the street F,;ving. <br />18. Contact the UVater District for connecting provisions for this building's <br />water and sewer services. <br />19. <br />20 <br />21 <br />A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is <br />required for the parking area. <br />If a sewer pump system is to be installed, the pressure line must discharge into a private <br />manhole, then gravity flow across the public right-of-way. <br />A sprinkler system is required for this building in compliance with the requirements of NFDA <br />Standards 13D. <br />F', � cam:r.ena <br />2�1 <br />