My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2138 W MUKILTEO BLVD 2016-01-01 MF Import
>
Address Records
>
W MUKILTEO BLVD
>
2138
>
2138 W MUKILTEO BLVD 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 1:20:22 PM
Creation date
2/26/2017 3:48:20 AM
Metadata
Fields
Template:
Address Document
Street Name
W MUKILTEO BLVD
Street Number
2138
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WEST <br />COAST <br />STRUCTURAL <br />ENGIIJEERING, INC. <br />---- -------��--- ------.__._ _._-- ._. ----------- -------- � �-- <br />70924 Mukitteo Speedxay, Swte A Mukilteo, WA 98275 Phone (d25) 147�8998 FaM (425) 341-8966 Emad� email�wcs� nel WNNJVJCSE NEi <br />January 11, 2010 <br />The Leren Company, Inc. <br />PO Box 12863 <br />Mill Creek, WA 98082 <br />Attention: Tom Leren <br />Subject: Heidnl Brothers Lot 1 Revision <br />WCSE Project No: W2851 <br />Dear Tom: <br />�jq( 2-Oa� <br />This letter is in response to plan changes to the above referenced project due to specific site conditions. <br />The structural calculations have been revised to reflect the following changes: <br />The upper roof framing and 2n° floor plan were modified by bumping out the entire 2"tl floor back wall 2'-0" <br />and eliminating the girder truss and partial bumpout at the master suite only. Revised header sizes and <br />sheanvalls are noted on the plans. <br />The 2nd floor framing plan has been modified to reflect the bumpout revision. Double 1'/." x 9 YZ' LVL joists <br />have been added to the framing plan to support the header point loads from the bumpout above. All floor <br />joists along the back portion of the house have been changed to 9 Y�" TJI PRO 210's. A few of the <br />windows along the back wall have been revised in size and location. The calculations and plans for the <br />windows along the back have been modified to reflect the additional loading from the 2"° floor plan <br />change. <br />Due to site topography, the Great Room exterior side wall and a portion of the back wall are required to be <br />designed as a ca�tilevered retaining wall. Attached to this letter and added as detail R/8 to the plans is a <br />cantilevered retaining wall schedule to be used in the specified location. The retaining wall was designed <br />as a cantilevered wall and the top may step down as grade allows with a cripple wall built on top. Where <br />the retaining wall extends to the 2nd floor framing, anchor boits should be located along the top following <br />the SV�i1 sheanvall requirements. In locations where cripple wails are constructed, the cripple wall should <br />be sheathed, nailed and anchored following SW1 shearwatl requirements. <br />If you have any further questions please contact our office. <br />Thank you, <br />�� ��fi ----- <br />�� . <br />Jeremy McCandless, PE <br />West Coast Structural Engineering Inc. <br />�h� ��_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.