Laserfiche WebLink
:� <br />1" <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />10 <br />11 <br />12 <br />x3 <br />14 <br />IS <br />16 <br />17 <br />18 <br />19 <br />I� <br />20 ' <br />BI ' <br />22 i <br />23 I <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />30 <br />Section !0: City Assumption of Ooeration and Maintenance <br />The City may assume the operation and maintmance of retention/detentIon <br />or other drainage treatment/abatement facilities after the expiraEion of <br />the two (2) year operation and maintenance period In connection wlth <br />the subdivision of land tf: . <br />(a) All oi the requirements of Section 9 of thIs ordinance have <br />. been fully complted with; and . <br />(b) . The facilittes have been inspected and acceptec hy the Utllity <br />Department aiter two (2) years of ope�ation in accordance wlth . <br />the Procedures Manual; and <br />(c) All necessary easements entitling the City to properly malntain <br />" the factlity have be.en conveyed to the .City and recorded wlth <br />the Snohomish County Auditor, arid � <br />has bem extend d forQone year, co eringtthe Ci�ty's fIrst yeac oi cr <br />operation a�d maintenance; and <br />(e) The developer has supplied to the City an accoundng of capital, <br />construction� and operatIon and maintenance expenses or other <br />items, for the dratnage facilities up to the end of the two year <br />� period. . ' • . , <br />in the event that the City'elects not to assume the operation and mntn- <br />tEriance responsibility for the facilitles; it will be the r:,sponslbility oi <br />the developer to make arrangements wlth the occupanu or owners of the <br />subject properiy for asiumption of maintenarice in a manner subject to <br />the approval of the C[ty Engineer�or ln accordance wIth the Procedurcs <br />Manual. Such arrangements shall be completed and approved �prlor to the <br />end oi th> two year perfod of developer responsiblltty. <br />It the City elects not to assume operat[on and maintenance responslbllity, <br />the drainage facilities shall be operated and maintalned In accordance ' <br />with the arrangements as approved by the City Engineer. The City may ' <br />� d continued use of the facilities for <br />a <br />a <br />inspect the facf.tties In or er to ensure , . . <br />the purposes Sor wfiich they were built and in accordance with these arrangements.. <br />•� , . . <br />Section I l: Retroactiviiy Re{atinR to CIty MaIntenahce of DralnaRe <br />� —� Facllities <br />If any devbloper constructIng retention/detention oc other dralnage <br />treatment/abatement facIlities and/or receiving approval of drainage �� ' <br />31 P��s prior to the effective date of, this ordii�ince re-evaluates according <br />32 to the requlrements of this ordlnance the facillties and/or plans so constructed <br />• -jt- , . • . • <br />! , � • , , . <br />Ir ' ' ' . , <br />; . . . . . <br />/ ,. .� , • , • � <br />I� . ' • •' .• ' ' , � ' � . . . . . . " <br />I. . . . . .. , . <br />� <br />n <br />m <br />