Laserfiche WebLink
everett INSPE�TIO1�1 REPORT <br />� Address o���� �� � �� <br />c � �� <br />Contraclor <br />pwner �� <br />Date � �~�" <br />IYPE OF <br />(X DG: Pmt. No.�a� <br />1 <br />� , EC: Pmt. No. <br />Temp. Elect. <br />❑ Footing <br />fd Foundation <br />❑ Ductwork <br />❑ Wood Stove <br />� Masonry <br />I,APPROVAL <br />iVIOLATlO <br />REQUESTED <br />il MECH: Pmt. No. <br />Cl PLBG: Pmt. No. <br />p Framing ❑ Gas Piping <br />❑ Drywall, Nailing ❑ Consultation <br />❑ Shear Nailing ❑ Groundwork <br />❑ Grid ❑ Struct. Slab <br />❑ Rough•In � Final <br />❑ Service <br />❑ PARTIAL APPROVAL <br />❑ CORRECTION REQUIRED <br />Ll Correctio s listed below MUST BE MADE betore work can ue approveu. <br />❑ Please ontact inspector and arrange for appointment. <br />❑ Was ot able to pertorm inspection. <br />L 259•8810 FOR REINSPECTION — 24 hour notice required. <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREMISES PRIOR TO OCCUPANCY. <br />