My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2327 W MUKILTEO BLVD 2016-01-01 MF Import
>
Address Records
>
W MUKILTEO BLVD
>
2327
>
2327 W MUKILTEO BLVD 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 8:08:05 PM
Creation date
2/26/2017 3:58:46 AM
Metadata
Fields
Template:
Address Document
Street Name
W MUKILTEO BLVD
Street Number
2327
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST ESTIMATE S�HEET <br />Receipt t� <br />X Cost of Work Order <br />Cost of Service Order <br />Contact Person Miles Friel <br />Requested By Gordon Witcher <br />Property Owner (name) John Friel <br />Charge Cost to (name if different thxn owner) <br />Address PO Box 27 <br />3,471.00 <br />City 6verett <br />Public Works Department <br />Utilities Division, 3200 Cedar Street <br />Everett, Washingtan 98201 <br />(42� 257-5800 <br />Date Paid <br />Work Order # <br />Service Order # <br />Telephone # 659-�3774 <br />Date of Request 8- l 5-97 <br />Zip 98206 <br />Installallon Location Bayview Ln <br />Installation type/description/size/etc. 8" hot tap. Expose main, make S" hot tap, install 8" gate valve, remove <br />DCDA and make final connection after puriry, restore area. <br />� The following estimate is based upon the Utilities Division providing all labor, equipment, materials, <br />restoration, and final hook-up. <br />� The following estimate is based upon the Street Division work group providing all labur, equipment, <br />materials and restoration to property. <br />Pleaae noNfv t6e Citv of Everett UtiliNes Divi�ion 10 workine davs in advance of reauired instnllallon date to <br />Allow for schedulioe and parts orocurement <br />Whenever the estimated cost is not sufficient to cover the total expense Cor labor, material, equipment rental and <br />admioistrative costs, the deficit shall be charged to the praperty for which such installation was made and t6e owner <br />thereof, and provided Nrther, that any ercess payment shall be returned to the person applying for the installation. <br />Itemized Cost Estimate: <br />Labor & Benefits <br />Material <br />Equipment Rental <br />Surface Restoration <br />TOTAL <br />1,620.00 <br />I,185.00 <br />666.00 <br />S3,a71.00 " <br />• Note: This is for hot tap and final connection only. Service for Lot �2 needs <br />separate S.O. Services for lots 3,4,5 are cantractor installed and need separate <br />S.O.'s. _ _ <br />Prepazed by: <br />Accepted by: <br />COSTAGND GCO+icsUL\IY]SN77 <br />Est. <br />8-25-97 <br />cc: Bldg. Pertnit Center <br />Clair Olivers <br />1'om Thetford <br />Kirk Braoks <br />Gordon Witcher <br />Dan Lowell <br />Stan Mitchell <br />Paul McKee <br />Gerry Crum <br />Representing: <br />
The URL can be used to link to this page
Your browser does not support the video tag.