Laserfiche WebLink
CLOSED CM WORK ORDERS REPORT <br />Total Utility Maintenance Management System <br />10/23/1995 <br />Page 1 <br />Date Range :01/09/1989 - 10/17/1995 <br />CM Work Order Range :1001091070001 - UT2608- <br />Item Range :<Blank> - WW22020001 Pattern :7101196750458 <br />Pattern <br />Program ALL Function ALL Activity ALL :* <br />CM WORK ORDER ID: 7101196750458 Title: REPAIR 33#-- KILTEO BLVD <br /><<DUPLICATE PRINTING OF THIS WORK ORDER>> 3�d <br />Item ID: -- <br />Location ID: -- <br />Program 710 Function 119 Activity 675 <br />Date Completed: 10/17/1995 <br />Overall Craft: <br />Issued: 10/17/1995 Issued by: WMW Assigned to: <br />Out of Service? NO Priority: Travel Time: 0.00 Hr. <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID <br />DL IRW <br />UL SSJ <br />DL WCA <br />Materials: <br />ID <br />ADAP36001047 <br />ADAP36001247 <br />BOX000056047 <br />COUP36006447 <br />ELL036102947 <br />NIPP36132347 <br />PIPE36060747 <br />SETT36033547 <br />Vehicles: <br />ID <br />---------- <br />V2117 <br />Name Planned Hrs Actual Hrs <br />-------------------------- - ------------ <br />IRVIN, RYAN WILLIAM 0.003.00 <br />SMITH, STEVE J. 0.00 8.00 <br />WHETSTINE, CHRISTOPHER A. 0.00 8.00 <br />Description <br />ADAPTER 1" CST X INSTA-TITE @ <br />ADAPTER 1" MIP X INSTA-TITE @ <br />BOX METER PLA 13" X 20" W/LID <br />COUPLING 1" COP X COP ELBOW @ <br />ELL 1" 90 DEG BRASS <br />NIPPLE 1" X 2" BRASS <br />PIPE 1" POLY I.P.S. <br />SETTER COP 1" (H1511) <br />Description <br />---------------------- <br />91 CHEV 1-TON HYD UNIT <br />Total Labor Cost: <br />Date <br />10/17/1995 <br />10/17/1995 <br />10/17/1995 <br />10/17/1995 <br />10/17/1995 <br />10/17/1995 <br />10/17/1995 <br />10/17/1995 <br /># Used <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />6 <br />1 <br />Total Material Cost: <br />Hours <br />M <br />Total Vehicle Cost: <br />Work Description: <br />--------------------------------------------------- <br />METER# 3418 <br />FIXED LEAK AND MOVED METER BEHIND SIDEWALK. <br />Cost <br />44.80 <br />44.80 <br />Cost <br />24.00 <br />120.24 <br />64.00 <br />208.24 <br />Cost <br />13.08 <br />10.93 <br />20.60 <br />6.02 <br />2.30 <br />1.74 <br />2.58 <br />78.80 <br />136.05 <br />