Laserfiche WebLink
r. <br />CLOSED CM WORK ORDERS REPORT <br />Total Util°.ty Maintenance Management System <br />02/27/1996 Page 1 <br />Date Range :01/09/1989 - 02/14/1996 <br />CM Work Order Range :1001091070001 - UT1002- - Pattern :7101236730080 <br />Item Range :<Blank> - WW22020001 Pattern :* <br />Program ALL Function ALL Activity ALL <br />---------------------------------------------------- --------------------- <br />---------------------------------------- ------------------- ---- <br />CM WORK ORDER ID: 7101236730080 Title: REPAIR 3110^MUKILTEO BLVD <br /><<DUPLICATE PRINTING OF THIS WORK ORDER>> <br />Item ID: DDL3494T63 -- DRAIN LINE <br />Location ID: -- <br />Program 710 Function 123 Activity 673 <br />Date Completed: 02/12/1996 <br />Overall Craft: <br />Issued: 02/08/1996 Issued by: HDA Assigned to: <br />Out of Service? NO Priority: Travel Time: 0.00 Hr. <br />Meter Readina: <br />Downtime: -0 hours <br />Status: HL <br />Labor: <br />Craft <br />ID <br />HEO <br />AAL <br />SUP1 <br />AGA <br />UL <br />GCR <br />HEO <br />LMA <br />UL <br />MHA <br />EO <br />MJL2 <br />SUP1 <br />WLK <br />Materials: <br />ID <br />CEME00061438 <br />COUP54304947 <br />N/A <br />N/A <br />Vehicles: <br />ID <br />------------ <br />V2047 <br />V3507 <br />VJ0004 <br />Name Planned Hrs <br />ARNOLD, ARTHUR L <br />0.00 <br />AHLES, GREGORY A. <br />0.00 <br />GRENZNER, CHRIS R. <br />0.00 <br />LIBBING, MAURICE A. <br />0.00 <br />MAROON, HERBERT ARTHUR <br />0.00 <br />MITCHELL, JEFFREY L. <br />0.00 <br />WARNER, LARRY K. <br />0.00 <br />Description <br />CEMENT 20 MIN. SET 50 LB. BAG <br />COUPLING 15" CONC X PVC <br />TOP COARSE (FROM STOCK) <br />9' OF 15" PVC PIPE (FROM STOCK <br />Description <br />------------------------------ <br />89 GMC S15 <br />88 CASE BACKHOE 4X4 <br />195 CHEV 1-TON <br />Actual Hrs <br />8.00 <br />2.00 <br />2.50 <br />2.50 <br />8.00 <br />8.00 <br />2.00 <br />Total Labor Cost <br />Cost <br />151.84 <br />42.68 <br />35.05 <br />39.13 <br />96.96 <br />147.04 <br />45.36 <br />558.05 <br />Date <br /># Used <br />Cost <br />-------- <br />02/12/1996 <br />-------- <br />1 <br />---------- <br />11.13 <br />02/12/1996 <br />1 <br />120.00 <br />02/12/1996 <br />7.18 <br />02/12/19960�09.•.- <br />Total Material Cost: <br />178.31 <br />�N7 <br />Hours <br />Cost <br />---------------- <br />2.00 <br />10.80 <br />8.00 <br />342.40 <br />8.00 <br />48.80 <br />Total Vehicle Cost: 402.00 <br />Work Description: <br />--------- <br />-------------------------------------------------------------------- <br />