Laserfiche WebLink
Application For �� <br />PUBLIC WORKS PERMIT Date J J/ �/[ <br />4[-77 <br />Works Permit # qM1 12 <br />PUBLIC WORKS DEPARTMENT Public <br />Z. 3200 Cedar Street <br />Everett, WA 98201 259-8B10 Building Permit If <br />SUN 18 19yi; <br />' -'"I POSTING 2O— <br />—-lxublic Works Fee $ <br />TYPE OR PRINT ONLY <br />CaTr—, Nwimc FbP.tiK 1003 Wa9o1Lg �def� V%G gS204� ZCof—Co3�Z <br />Owner Mailing Address City Zip Phone <br />1:- c; :.: ::.- <br />(Zi k�r� H Let; �ssec i 55 =1� ,Adt t E*JCO COWS; 7-Ct,—,Nft - 46T1 <br />Applicant Mailing Address $�. I Ie-vLlEityVeil, Zip V Phone <br />Describe Proposed Work v M0v(, under reurd -putt -Ez.rlks cajkllocn' ores ;Rr18 <br />W <br />YL° vice W;-bl -Ivue. G(Mln,:4 - <br />-4110 ® <br />♦♦�^^ <br />V+ <br />PROJECT ADDRESS (if known) OgO3 WCZ15 n 1ZGt Z 1ZDGt�C�C t tP_.Y <br />ca <br />Attach four (4) copies of plans for proposed work - Draw to scale and note the following if applicable: <br />_ <br />•Property Lines 'Outline and dimensions of all existing and proposed structures on the lot •Existing and proposed utilities <br />O <br />•Centerline of street •Indicate North *Show any reposed grading changes •Show measurements <br />DO NOT WRITE BELOW THIS LINE <br />PERMIT CONDITIONS: <br />1. All calls for inspection shall be made 24 hours in advance - phone 259-8810. <br />z <br />2. All work shall be performed in accordance with this permit and current City of Everett Design and <br />O <br />Construction Standards and Specifications. <br />3. Call Location Underground Service 48 hrs. before you dig, TOLL FREE NUMBER 1-800-424-5555. <br />I The old tank must be pumped ot'product prior to removal. No product or rinse water may <br />be disposed of in such a way that it could enter the storm drainage system. <br />=. To help minimize erosion, any spuil piles must be covered with plastic sheeting or other <br />O <br />impervious covering staked to flue ground or anchored with rocks or sandbags. <br />3. Berns, earthen or otherwise, should be constructed at the perimeter of excavated areas M <br />a <br />prevent acljaeant site runoff fi•om entering the excavations. <br />4. Tank removal should be performed dw ing a period of expected dry weather to minimize <br />potential erosion problems and contamination of runoff waters. <br />�. If contamination ofthe sul rou ndigg soils is discovered, and remediation will take place, <br />at erosion control plat must be submitted for approval by the Public Works Deparainent. <br />G. All applicable Department of Ecology rules and regulations must be followed. <br />A5rxxr P-lao sijlc-m'.4: ec�! wrrh 3I�PI;eL2�f��en. <br />[7, <br />�1 t,� /- 4. <br />C:. C17CC_11-1 r'rC. Lcl'Z. r" 11'IOnY�. {�2iM ll. "ti'� Abok�?c Ci�2VrCP�(�bl'' -. <br />'t i CG,"PIy wf7h c-r,n C;- iv.,I <br />fqC Q,►/vl <<Cp—� 3/21/cicc <br />Approved for Con tmclion Ualc <br />FINAL INSPECTION Date <br />Approved as Constructed <br />;6CKNOWLEDGEMENTOF' ONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and save harmless <br />the City of Everett from any and all claims for damages, costs, expenses, or <br />causes of action that may arise because of installation and maintenance of <br />the improvement or ether right-of-way use hereto applied for and further agrees <br />to remove same upon notice from the City and to replace public property <br />damaged thereby. <br />140141 �.,�< (vf,.s 3� 9 <br />Sig4na0ecif Applicant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS :F DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br />COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />