Laserfiche WebLink
% 35'-=�-: <br />Date_���Y' <br />Application For <br />PUBLIC WORKS PERMIT <br />Print or Type Only <br />Address <br />Describe Proposed Work <br />Prolect Address (if known) <br />Zip <br />PubLr. Wo�hs Pormii e�Y `� � — /�OJ <br />eme oao�. • Q cT�f(i � � <br />PubLc wo�k! Feo S <br />Total Fee <br />Losa Appl Fea PaIE S <br />Bolance0uo S �� <br />33�- <br />Phone <br />Zip rnone <br />Attach lour (4) copies of plans lor proposed work • Draw to scale and note the foltowing as applicable: <br />• Property Lines • (.enter�ine of s�reet <br />• Oulline and dimensions ol all r,r.isting and • Indicate North <br />proposed structures on the lot • Show a�y proposed grading changes <br />• E,cisting and proposed utilities • Show measurements <br />FINAL INSPI <br />Approved as <br />everett <br />e <br />PERMIT CONDITIONS <br />1. All cails for inspoction shall be ��ade 24 hrs. in advance - phone �59•881 5. <br />2. All work shell bc performed in accordance with this permit and current City of Everett Design and Construction <br />Standards and Specitications. <br />3. Call Location Underground Service 48 hrs. belore you dig. TOLL FREE NUMBER 1•800•424•5555. <br />PUBLIC WORKS DEPARTMENT <br />3200 Cedar Street <br />Everetl, WA 98201 <br />Phone: 259-8815 <br />ACKNOWLE�GEMENT OF CONDITIONS <br />� <br />� <br />� <br />a <br />The undersigned owner/applicant h�reby agrees to hold �nd save harm- <br />less the Ciry ol Everett Irom any and all claims for damages, costs, <br />expenses, or causes of action tnat may arise because ol installation <br />and maintenance ol the improvemenl or other right-ol•way use hereto <br />applied tor and furlher agrees to remove same upon notice Irom the <br />City and lo replace public property damaged thereby. <br />_��(T �� <br />Signature ot Applicant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN <br />780 DAYS OF DATE PERMITISISSUED AND THEREAFTER IS TO <br />BE DILIGENTLY PURSUED TO COMPLETION. THIS PERMIT MAY BE <br />CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS <br />PROJECT OVER 90 DAYS DURATION. <br />